Similar Projects
Josiah Quincy Elementary School Envelope Project - General Bids
New Construction
Bidding
$13,000,000 est. value
MA 02111

Door/Hardware Repairs at Various BPS Locations
Post-Bid
Boston, MA

Repair and Installation of New Doors and New Hardware at Various Schools
Post-Bid
Dorchester, MA

Jetblue Hangar 8- Hangar Door Repairs
Results
Less than $1,150,000 est. value
Boston, MA

FY21-23 Authority Wide Overhead and Automatic Door Repairs
Results
$425,900 est. value
East Boston, MA

Emergency Overhead Door Repairs
Post-Bid
Boston, MA

Window Sash Replacement in Rooms 219-222
Results
Chelsea, MA

On-Call as Needed Overhead Door Repair Services
Term Contract
Post-Bid
$100,000 est. value
Dorchester, MA

Wasylean Exterior Door Replacement at Worcester State University
Results
$40,000 est. value
Boston, Worcester, MA 01602

Transitions Window Replacement
Post-Bid
Boston, MA 02126

On Call and as Needed Glass and Glazing Services at Various Boston Public Schools
Results
Dorchester, MA

Transitions Windows Repair and Replacement
Alteration
Post-Bid
Less than $350,000 est. value
Boston, MA 02126

Ligature Resistant Door Handle Replacement
Results
$68,000 est. value
Boston, Jamaica Plain, MA 02130

Semi Annual PM of Tewksbury Hospital Power Operated Access Doors Campus Wide
Alteration
Post-Bid
Boston, MA

Front Vestibule Doors Modifications
Results
$15,000 est. value
Chelsea, MA 02150

Reported 05/06/2022 12:00 AM
Project Title

Sectional Overhead Doors

Physical Address View project details and contacts
City, State (County) Boston, MA   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) Windows/Doors
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $30,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

In general, furnish all labor, material and equipment necessary to complete the work of this section, including but not limited to the following: 1. Remove the existing overhead door and legally dispose of them off-site. Replace with new insulated sectional overhead doors with standard lift and any associated hardware to the existing overhead door system. B. Prepare overhead door in accordance with manufacturer s recommendations.

Details

Division 08 - Openings, Doors and Frames, Windows.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents