Similar Projects
Westland Reservoir/Booster Station - Phase II - UT00502 - City of Peoria
Infrastructure
Conception
$5,450,000 CJ est. value
Peoria, IL 61603

New Restroom and Site Work W. H. Sommer Park
New Construction, Infrastructure
Design
$251,000 CJ est. value
Edwards, IL 61528

Nebraska Ave Street Lighting - Knoxville to Wisconsin
Infrastructure
Bidding
$510,000 CJ est. value
Peoria, IL 61603

Bridge Rehabilitation With Bridge Deck Overlay, Roadway Lighting, Traffic Signal Improvements, Drainage, Sidewalk Removals on IL 40
Infrastructure
Bidding
$400,000 CJ est. value
Dunlap, IL 61525

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Water Main Improvements
Infrastructure
Post-Bid

GPSD Sewer Rehabilitation; Erosion Control, Project 2
Results
Less than $1,400,000 est. value
Peoria, IL 61600

Slope Repair and Drainage Improvement
Infrastructure
Results
IL

Culvert Rehabilitation on US 150
Infrastructure
Bidding
$700,000 CJ est. value
Edwards, IL 61528

Corrugated Structural
Infrastructure
Post-Bid
Peoria, IL

Slope Stabilization and Landscaping
Infrastructure
Results
Peoria, IL

Jiffy Lube / Knoxville & Crossing, Peoria
New Construction, Infrastructure - 3,438 SF
Bidding
$910,000 CJ est. value
Peoria, IL 61615

Dirksen Drainage Improvements
Infrastructure
Post-Bid
Peoria, IL

Removal of the Three 36-Inch Diameter Culverts
Infrastructure
Results
IL

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Last Updated 11/01/2022 07:31 PM
Project Title

Culvert Replacement for East Branch of Dry Run Creek at West Merle Lane

Physical Address View project details and contacts
City, State (County) Peoria, IL 61604   (Peoria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Accepting Solicitations, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,261,829 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed improvement consists of removing the existing corrugated metal pipe drainage structure where Merle Lane crosses the East Branch of Dry Run Creek, constructing a precast three sided structure, placement of permanent erosion control/armoring, and relocating sanitary sewer lines. All proposals must be accompanied by cash, certified check, cashier's check, or a bid bond for not less than five percent (5%) of the amount of the bid. The successful bidder will be required to furnish a satisfactory Performance Bond for the full amount of the contract, with sureties, to be approved by the City Stormwater Engineer. Compliance with the Illinois Prevailing Wage Act is required under this contract. The City of Peoria reserves the right to waive technicalities and to reject any or all proposals.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents