Similar Projects
Furnace and A/C units (2 Locations)
Renovation
Design
Lynnville, IN 47619

Penn-Harris-Madison HVAC Projects (4 Buildings)
Renovation
Sub-Bidding
$400,000 CJ est. value
Mishawaka, IN 46544

Medium Housing Unit A Domestic Hot Water Heater Replacement at Miami Correctional Facility
Renovation
Sub-Bidding
$250,000 CJ est. value
Bunker Hill, IN 46914

Performance Contract for Energy Conservation and Facility Improvements
Post-Bid
Francesville, IN

HVAC Repair and Replacement
Post-Bid
Fort Wayne, IN 46805

Ivy Hall Chiller Replacement
Results
Less than $700,000 est. value
Lafayette, IN 47905

McGary Middle School Chiller Replacement
Results
Evansville, IN 47714

Medium Housing Unit Water Heater Replacement N House at Wabash Valley Correctional Facility
Renovation
Sub-Bidding
$200,000 CJ est. value
Carlisle, IN 47838

HVAC Routine Maintenance Services
Term Contract
Post-Bid
Gary, IN

Perry Heights Middle School Chiller Replacement Project
Results
Evansville, IN 47712

HVAC Equipment for Critchfield Elementary School
Term Contract
Sub-Bidding
La Porte, IN 46350

Pre-Conditioned Air Units and 2 Ground Power Units
Post-Bid
Fort Wayne, IN

CEP Cooling Tower Replacement Repair Cooling Tower 3
Results
Indianapolis, IN 46214

HVAC Equipment for Kingsford Heights Elementary School
Term Contract
Sub-Bidding
Kingsford Heights, IN 46346

2021 Castle High School HVAC Replacement
Post-Bid
Boonville, IN

Last Updated 09/05/2022 05:38 AM
Project Title

Thomas Jefferson Middle School Chiller Replacement and Related Work Project

Physical Address View project details and contacts
City, State (County) Valparaiso, IN 46383   (Porter County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

All work for the complete construction of the Project will be under one or more prime contracts with the Owner based on bids received and on combinations awarded. The Construction Manager will manage the construction of the Project.Construction shall be in full accordance with the Bidding Documents which are on file with the Owner and may be examined by prospective bidders at the following locations: The Skillman Corporation 8006 Aetna Street Merrillville, IN 46410 Prime and Non-Prime Contract Bidders must place an order on portal to be able to download documents electronically or request printed documents. Bid security in the amount of ten percent (10%) of the Bid must accompany each Bid in accordance with the Instructions to Bidders. The successful Bidders will be required to furnish Performance and Payment Bonds for one hundred percent (100%) of their Contract amount prior to execution of Contracts. Contractors submitting bids for the performance of any Work as specified in this building Project should make such Bids to Valparaiso Community Schools. Contractors are advised that the Contract as finally entered into with any successful Bidder may be entered into with either the School Corporation or the Building Corporation or certain portions of the Contract may be entered into by both the School Corporation and the Building Corporation. The Owner reserves the right to accept or reject any Bid (or combination of Bids) and to waive any irregularities in bidding. All Bids may be held for a period not to exceed 60 days before awarding contracts.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents