Similar Projects
Residences at Sportsmen's Lodge
New Construction
Conception
$500,000,000 est. value
Los Angeles, Studio City, CA 91604

12th & Main Tower
New Construction - 343,447 SF
Conception
est. value
Los Angeles, CA 90015

One Beverly Hills
Demolition, New Construction, Renovation, Infrastructure
Design
$2,000,000,000 CJ est. value
Beverly Hills, CA 90210

Violet Street Mixed-Use Building
New Construction, Infrastructure - 511,604 SF
Design
$100,000,000 CJ est. value
Los Angeles, CA 90021

Colima Road Rehabilitation
Infrastructure
Post-Bid
$6,400,000 est. value
Whittier, CA 90603

Valley View Avenue & Rosecrans Avenue Intersection Improvements
Infrastructure
Post-Bid
$617,000 to $620,000 est. value
Santa Fe Springs, CA 90670

Paving Of Residential And Major Streets Rehabilitation Project
Infrastructure
Results
$1,500,000 est. value
Baldwin Park, CA 91797

Install Wired Mesh Drapery System and Slope and Roadside Paving
Infrastructure
Results
$2,880,000 est. value
CA

Province at San Gabriel Condominiums
New Construction, Build-Out, Infrastructure - 195,000 SF
Construction
$20,000,000 est. value
San Gabriel, CA 91776

Pinnacle 360 Apartments
New Construction
Construction
Los Angeles, CA 90004

Crossroads of the World
Demolition, New Construction, Infrastructure - 285,000 SF
Pending Verification
$1,000,000,000 CJ est. value
Los Angeles, CA 90028

Yucca Argyle Multi-Use Development
Demolition, New Construction, Infrastructure - 316,948 SF
Pending Verification
$180,000,000 CJ est. value
Los Angeles, CA 90028

8th & Grand Mixed Use Development
New Construction
Conception
Los Angeles, CA 90017

5001 Wilshire Boulevard Apartment Complex
New Construction, Build-Out - 10,900 SF
Design
Los Angeles, CA 90036

RFP D/B - San Gabriel Valley Aquatic Center
New Construction, Infrastructure
Post-Bid
$26,000,000 CJ est. value
La Puente, CA 91744

Last Updated 01/04/2023 04:02 PM
Project Title

20th Street Medical Research Center / Santa Monica

Physical Address View project details and contacts
City, State (County) Santa Monica, CA 90404   (Los Angeles County)
Category(s) Heavy and Highway, Laboratory, Medical
Sub-Category(s) Laboratory, Medical Office/Outpatient, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $39,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project would involve the demolition of approximately 1,313 sf of existing building formerly used as a funeral home/chapel, composing mainly of the rear alley facing garage section of the building, and both of the former residential structures. Approximately 7,965 sf of the existing funeral home and chapel building would be adaptively reused. It is anticipated that the former funeral home's interior will be remodeled. The project would include the construction of a new addition building on-site, comprising approximately 59,548 sf of new floor area (FAR). With the new construction and adaptive reuse of existing floor area, the Wellness Center would be approximately 67,513 sf. This would include 53,091 sf of Research & Development uses, 17,702 sf of Clinic/Office uses, and 8,239 sf of ancillary meeting Facilities. As of January 4, 2023, a demolition and building permit application has been filed with the City of Santa Monica. An architect has been selected. Information regarding the selection of a general contractor has not been disclosed. Construction is anticipated to begin in first quarter 2023.

Details

Parking Space/Stalls, 218 Parking Spaces. 3 Stories Above Grade, 67,513 SF.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Entrances and Storefronts, Windows, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Wall Coverings, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Laboratory Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Casework, Specialty Casework, Laboratory Casework, Countertops, Laboratory Countertops, Furnishings and Accessories, Seating, Institutional Furniture, Laboratory Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, HVAC Fans, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents