Similar Projects
New Bedford Hurricane Barrier Dewatering
Design
$1,000,000 to $5,000,000 est. value
New Bedford, MA

Install an Oil Water Separator
Post-Bid
$77,000 est. value
Taunton, MA

Drilling IDIQ In Massachusetts and Rhode Island
Post-Bid

Scheduled and Emergency Drainage Repairs and Improvements at various Locations
Results
Less than $685,975 est. value

Scheduled and Emergency Drainage Structure Reconstruction and Repairs at Various Locations
Results
Less than $637,000 est. value

Scheduled and Emergency Drainage Structure and Pipe Cleaning at Various Locations
Results
Less than $470,000 est. value

Road Materials - Aluminum, Concrete, Plastic Pipe
Results
Berkley, MA

Drilling IDIQ in Massachusetts and Rhode Island
Results

Bottom of CAD Cell No. 4 and North Terminal Expansion Project
Results
Less than $22,000,000 est. value
New Bedford, MA

Briggs Street Culvert Replacement
Results
$320,000 est. value
Dighton, MA 02715

Slope Stabilization, Greenwood Terrace 667-1
Results
Less than $42,530 est. value
Westport, MA

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations
Results
$680,575 est. value

DeMedeiros Grade Construction
Results
$40,000 est. value
New Bedford, MA 02745

Scheduled and Emergency Drainage Structure Repairs at Various Locations
Infrastructure
Results
$571,440 est. value

Edmond P. Talbot Middle School Drainage Improvements
Infrastructure
Results
$1,200,000 est. value
Fall River, MA 02723

Last Updated 10/20/2021 09:19 AM
Project Title

Almy Road Culvert Replacement Project

Physical Address View project details and contacts
City, State (County) Somerset, MA 02726   (Bristol County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $538,080
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work involves removal and disposal of an existing failing culvert on Almy Road composed of twin 48" corrugated steel pipes and reinforced concrete headwalls. The replacement culvert will be composed of twin 60" corrugated plastic pipes and reinforced concrete headwalls and wingwalls. A 12" water main will also be removed, disposed, and reinstalled within the roadway.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents