Similar Projects
Mount Peace Cemetery Expansion
Alteration
Conception
Akron, OH 44303

Hudson Greenway Trail - State of Ohio
Infrastructure, Alteration
Conception
$750,000 est. value
Hudson, OH 44236

Wyoga Lake Road Infrastructure & Apartment Building
New Construction - 2,000 SF
Design
Cuyahoga Falls, Stow, OH 44224

Girl Scouts STEM Center for Excellence / Peninsula
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Peninsula, OH 44264

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Kent State University Airport Runway Design Study
Infrastructure
Post-Bid
$160,000 CJ est. value
Stow, OH 44224

Veterans Trail - Phase 3
Results
$1,047,802 est. value
Hudson, OH 44236

White Pond Road Resurfacing (CH 317)
Infrastructure
Results
$1,228,618 est. value
OH

White Pond Drive Mixed Use
New Construction, Infrastructure - 51,720 SF
Pending Verification
$55,000,000 CJ est. value
Akron, OH 44313

Sgt Clean Car Wash / Fairlawn
Demolition, New Construction, Infrastructure - 5,600 SF
Pending Verification
$5,000,000 CJ est. value
Fairlawn, OH 44333

Portage Lakes Drive Community Park - State of Ohio
Renovation
Conception
$300,000 est. value
Portage Lakes, OH 44319

Goddard School Addition / Macedonia
Addition, Infrastructure - 3,535 SF
Design
$700,000 CJ est. value
Macedonia, OH 44056

Ravenna Road Resurfacing Part 1
Infrastructure
Post-Bid
$956,257 est. value
Akron, OH

2022 Asphalt Sealing Repair Overlay Markings - LHA Locations
Infrastructure
Results
Akron, OH

Wallhouse Inn
New Construction, Infrastructure - 66,870 SF
Pending Verification
$10,000,000 CJ est. value
Hudson, OH 44236

Last Updated 07/06/2023 06:03 PM
Project Title

Lock 3 Park Project

Physical Address View project details and contacts
City, State (County) Akron, OH 44308   (Summit County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Bridge, Park/Playground, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $17,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Duration: Not to exceed 510 calendar days City of Akron Local Goal: 18% EDGE/DBE/MBE/WBE/SBE/VBE (minimum 3% WBE) All sealed bids should be clearly marked Lock 3 Park Project on the outside of the envelope. Any bids received after the time designated in this advertisement will be returned unopened. Project Description: This project includes furnishing and installing all labor, equipment, materials and incidentals required to construct the new Lock 3 Park including performance pavilion and associated landscape, hardscape, and utilities. The project includes demolition of existing structures/utilities/etc. and construction of the new pavilion, pedestrian bridge, benches, balconies, furnishings, landscape, and appurtenant features. Bidding Documents: Complete sets of Bidding Documents will be issued to Bidders only by AA Blueprint, beginning , at a cost of Four Hundred Dollars ($400.00). Checks or Money Orders are to be made payable to AA Blueprint located at 2757 Gilchrist Rd. Akron, Ohio 44305, or can be purchased on their website Bidders are required to use the bidding forms included in the contract/bidding specifications. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder must submit evidence of its experiences on projects of similar size and scope. Bid Bond: Each bidder is required to furnish with his proposal a Bid Guarantee and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. The bid bond may be in the form of a bid guarantee, letter of credit for 100% of the project, or certified check from a solvent bank or cash in the amount of 10% of the total bid submitted. Bid security furnished in Bond form shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide such surety. Checks should be made payable to the Ohio & Erie Canalway Coalition. Bid guarantees/bid bonds will be returned to all unsuccessful bidders. Bond must be executed on the forms provided in the bidding and contract documents. Standard bonding documents will not be acceptable. Electronic versions of the bidding documents will be provided at no cost to any potential bidder or potential subcontractor by request at The Richard Howe House or Anser Advisory at the above addresses. Questions: All questions concerning the project should be submitted in writing by 1:00 PM March 17th, 2023, to Kathryn DeMuesy at Anser Advisory: kathryn.demuesy@anseradvisory.com Additional Information: All contractors and subcontractors involved with the project will, to the extent practicable, use Ohio products, materials, services, and labor in the implementation of the project. Bidders must use the prepared forms provided therefore which include compliance with Section 34.03 of the Codified Ordinances of the City of Akron, Ohio regarding public contracts. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, the Governor s executive Order of 1972, and Governor s Executive Order 84-9 shall be required. Bidders must comply with the Federal Davis Bacon wage rates on Public Improvements in Summit County and the City of Akron, Ohio. OECC reserves the right to reject any and all bids, to waive any and all informalities and the right to disregard all non-conforming, non-responsive, unbalanced, or conditional bids. Also, OECC reserves the right to reject the bids of any bidder if OECC believes it would not be in the best interest of OECC to make the award of that bid; whether because the bid is not responsive, or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standards or criteria established by OECC. As of July 6th 2023, a ground-breaking ceremony took place on April 6th and the project is most-likely under construction. A general contractor has been selected. Information regarding an architect has not been released. A firm construction timeline has not been set.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Selective Clearing, Grading, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Retaining Walls, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents