Similar Projects
Adams Street Storm Drainage Improvements
Infrastructure
Bidding
Forsyth, GA

290 Batesville Road Stormwater Project
Infrastructure
Bidding
$700,000 est. value
Milton, GA 30004

Stormwater Rehabilitation Program
Post-Bid
Gainesville, GA

Pre-Qualification for Storm Water System Repairs
Post-Bid
Macon, GA

Cured-In-Place Storm Pipe Relining Project
Results
Norcross, GA 30071

Citywide Stormwater Improvements
Results
Less than $329,231 est. value
Union City, GA 30291

2020 CDBG Street and Storm Drainage Improvements
Infrastructure
Bidding
$600,000 est. value
Eatonton, GA

Combined Sewer Replacement
Post-Bid
Atlanta, GA

North Lee Street Storm Drain Improvements
Results
Less than $2,700,000 est. value
Americus, GA 31709

FY 2021 CDBG Water System Improvements
Infrastructure
Bidding
$800,000 est. value
Clayton, GA

Prequalification Of Contractors for The Period 2021-2022
Post-Bid
Marietta, GA

FY 2020 Storm System Repairs Project 2
Results
Stone Mountain, GA

2022 Stormwater Maintenance Project
Infrastructure
Bidding
$300,000 est. value
Holly Springs, GA

781 James Circle Storm Drain Repair Project
Post-Bid
Lawrenceville, GA

Medical Drive Storm Drainage Improvements
Results
Elberton, GA 30635

Last Updated 05/23/2022 04:32 AM
Project Title

Harrington Lane Storm Drain Replacement Project

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA 30046   (Gwinnett County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor consists of but is not limited to the following major items: Demolition and removal of existing 24” CMP Pipe storm drain pipe system including stone bedding and backfill up to spring elevation with # 57 stone. 1. Install new 24” HDPE pipes and tie-in to existing structures 2. Installation of new 24” Pre-cast Headwalls. 3. Installation of sod/mulch including erosion control. 4. Install complete fencing & cleanup Re-grout structures. 5. The unit price for installation by the LF on all stormdrain pipes shall incluse stone bedding and backfill with #57 stone up to min. spring elevation.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents