Last Updated | 05/23/2022 04:32 AM |
Project Title | Harrington Lane Storm Drain Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Lawrenceville, GA 30046 (Gwinnett County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contractor consists of but is not limited to the following major items: Demolition and removal of existing 24” CMP Pipe storm drain pipe system including stone bedding and backfill up to spring elevation with # 57 stone. 1. Install new 24” HDPE pipes and tie-in to existing structures 2. Installation of new 24” Pre-cast Headwalls. 3. Installation of sod/mulch including erosion control. 4. Install complete fencing & cleanup Re-grout structures. 5. The unit price for installation by the LF on all stormdrain pipes shall incluse stone bedding and backfill with #57 stone up to min. spring elevation. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |