Similar Projects
Haikey Creek Trunk Sewer Phase 1 - Construction - HC21010 - City of Broken Arrow
Infrastructure
Conception
$4,090,075 est. value
Broken Arrow, OK 74011

Vandever East 6th Addition - City of Broken Arrow
Alteration
Conception
$485,000 est. value
Broken Arrow, OK

B403 Extractor Utilities
Design
$25,000 est. value
Tulsa, OK

Haikey Creek Interceptor Phase 1 Improvements
Infrastructure
Bidding
$1,405,000 est. value
Broken Arrow, OK

2022 Water System Improvements - Deer Run Booster Pump Station
New Construction
Bidding
$560,000 est. value
Bixby, OK

2nd Street Sanitary Sewer Pipeline Rehabilitation
Infrastructure
Post-Bid
Sand Springs, OK 74063

Sheridan Road Booster Pump Station
Infrastructure
Post-Bid
Collinsville, OK 74021

Manhole Rehabilitation
Infrastructure
Results
Tulsa, OK

Battle Creek Tank Inlet-Outlet Modifications and 12 Inch Suction Line Project B
New Construction, Infrastructure
Results
Broken Arrow, OK 74011

Elm Creek Trunk Sewer Replace - S.1606 - Right of Way
Alteration
Conception
$474,400 est. value
Broken Arrow, OK 74011

Composite Manhole Frames and Covers
Infrastructure
Post-Bid
Tulsa, OK

Phase 2 Spunky Creek Interceptor Main Stem South Phase 2
Infrastructure
Results
OK 74134

Hai Key Creek Lift Station Phase 3 Force Main - Construction - HC1802 - City of Broken Arrow
Renovation
Conception
$561,360 est. value
Broken Arrow, OK

Villas on the Green Lift Station Conversion
New Construction
Post-Bid
$180,000 est. value
Broken Arrow, OK 74011

Phase 1 Spunky Creek Interceptor Main Stem South Phase 1
Infrastructure
Results
OK 74134

Last Updated 06/27/2022 12:06 AM
Project Title

Contract 2 Phase 2 East 53rd Street and Riverside Drive - Cherry Creek Lift Station Pump Restoration and Force Main Improvements

Physical Address View project details and contacts
City, State (County) Tulsa, OK   (Tulsa County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents