Similar Projects
County Road 4 Waterline Relocation
Infrastructure
Results
Gulf Shores, AL

Installation of Advanced Metering Infrastructure
Results
$354,825 est. value
Robertsdale, AL 36567

Water System Improvements Phase 1 Friendship Road to County Road 13 USDA Rural Development
Results
Daphne, AL 36526

Effluent Outfall Upgrades USDA Rural Development
Post-Bid
Loxley, AL 36551

Sr-182 State Park Road 2 Water Main Extension
Infrastructure
Bidding
Gulf Shores, AL

Canal Road Widening Water Main Relocation (SR-161 to Wilson Boulevard)
Infrastructure
Bidding
Orange Beach, AL 36561

Plastic Pipe
Post-Bid
Daphne, AL

Construction of Raw Water Main for Diamante Well
Infrastructure
Post-Bid
$235,000 to $380,000 est. value
Daphne, AL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Canal Road Widening Water Main Relocation (Phase 2)
Infrastructure
Bidding
Orange Beach, AL 36561

U.S. 98 Water Main Improvements Phase A - Ryan Road to Gable Street
Results
$390,000 to $440,000 est. value
Daphne, AL 36526

County Road 4 Raw Water Main Upgrades
Post-Bid
Orange Beach, AL

Installation of Bored Pipelines for Waterline Expansion - Baldwin Beach Express
Results
Summerdale, AL 36580

On Call Contractor Services for Water and Sewer
Infrastructure
Results
$30,000 est. value
Fairhope, AL

Provision of Roadway Pipe for the Baldwin County Commission
Results
AL

Reported 09/01/2021 08:04 AM
Project Title

Foley Beach Express Extension Water Main Relocation

Physical Address View project details and contacts
City, State (County) Orange Beach, AL   (Baldwin County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method
Project Status Abandoned
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: The construction of approximately 700 linear feet of 12" ductile iron water main, 80 linear feet of 10" ductile iron water main, 60 linear feet of 20" steel casing, abandonment of existing water mains, site restoration, and all other related appurtenances.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents