Similar Projects
Annex Building HVAC Replacement
Alteration
Bidding
Oklahoma City, OK 73117

Heat Air - Conditioning Services
Alteration
Bidding
Shawnee, OK

HVAC Services
Post-Bid
Lawton, OK 73501

HVAC Systems Water Treatment Program
Alteration
Post-Bid
Oklahoma City, OK

Cleaning of HVAC System SPRO
Results
Anadarko, OK 73001

Z1da--635-22-148 Correct Research Ventilation System (Va-21-00026378)
Results
Oklahoma City, OK 73104

Registry Building - HVAC Controls Upgrade Mike Monroney Aeronautical Center
Alteration
Bidding
Oklahoma City, OK 73169

H141--HVAC systems Software Building Main
Term Contract
Post-Bid
Muskogee, OK

HVAC Maintenance and Repair Project
Results
$200,000 est. value
Oklahoma City, OK

Hoods and Ducts Cleaning
Term Contract
Bidding
Altus AFB, OK

Central Middle School - 2021 HVAC Renovation
Alteration
Post-Bid
Edmond, OK 73034

Guthrie GUES and JR High Gym HVAC Renovation
Results
Guthrie, OK

SPS Skyline HVAC and Roof Improvements
Alteration
Bidding
Stillwater, OK 74075

Will Rogers Elementary HVAC Replacement
Alteration
Post-Bid
Oklahoma City, OK 73142

J041--Chiller #2, #3, & #4, Repair Oklahoma City VA Health Care System Oklahoma City, OK 73104
Term Contract
Results
Oklahoma City, OK 73104

Last Updated 10/14/2021 01:31 PM
Project Title

Z2da--(Con) 635 - Oklahoma City Vamc Replace Lawton Outpatient Clinic Air Cool Chiller (Va-21-00046407)

Physical Address View project details and contacts
City, State (County) Fort Sill, Oklahoma City, OK 73503 (Canadian, Comanche Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide supervision, manpower, and materials turnkey to replace existing Trane air cool chiller with new 100 tons air cool chiller. Contractor shall provide including but not limit to the following: Disconnect power and tagout logout electrical to existing Trane air cool chiller. Drain water from existing Trane air cool chiller and disconnect existing chilled water piping from existing Trane air cool chiller. Lift existing Trane air cool chiller up to trailer and remove from site. Set new 100 tons air cool chiller packet with circulation pump on the existing chiller pad. Contractor shall replace existing butterfly valves at existing chilled water supply and return piping. Necessary retrofit existing chilled water piping to accommodate new air cool chiller chilled water piping connection and connect existing chilled water piping to new air cool chiller chilled water piping connection. Retrofit Chilled water piping at the existing chilled water pump with bypass butterfly valve around the existing chilled water pump. Valve and piping configuration to isolate the existing chilled water pump for future use. On-board pump package in new air cool chiller will be used to pump chilled water through existing chilled water piping loop. Insulate new chilled water piping with fiberglass insulation and aluminum jacket. Install junction box for new air cool chiller at the existing chiller pad and connect power to new air cool chiller. Install heat trace cable on new piping section to prevent freezing. The existing air cool chiller controls by Johnson controls Building HVAC control in the facility, connect Johnson Controls to new air cool chiller. After the installation of new air cool chiller completed, factory start up shall perform and put new air cool chiller in operation. 13. The new replacement 100 tons air cool chiller is based on Trane air cool chiller Model CGAM. The other air cool chiller manufacture can be used if their air cool chiller meets specification section 23 64 00 and Trane air cool chiller Model CGAM specifications or exceeds. 14. The existing air cool chiller concrete pad can be reused, if the dimension of existing concrete pad is sufficiency to support new air cool chiller. There is some repair may require. 15. Should the new air cool chiller dimension is bigger than existing concrete pad, the contractor shall enlarge the existing concrete pad for supporting new air cool chiller. 16. Contractor may provide temporary air cool chiller and electric generator during the replacement of the air cool chiller. The temporary air cool chiller should provide chilled water 120 gpm at 45 deg-F. The temporary air cool chiller and electric generator shall be bid as an option.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents