Similar Projects
Rasmussen College
Renovation - 44,000 SF
Conception
Odessa, FL

University Station Hollywood - Master Plan
New Construction, Build-Out - 11,000 SF
Conception
$40,336,400 est. value
Hollywood, FL 33020

Herbert University Center Kitchen Addition
Addition - 6,620 SF
Design
$2,000,000 est. value
Jacksonville, FL

Keiser University
New Construction - 41,156 SF
Design
$5,000,000 to $10,000,000 CJ est. value
New Port Richey, FL 34652

Gator Village aka Honors Residential College
New Construction
Bidding
$225,000,000 est. value
Gainesville, FL

Building O Advanced Workforce Training Complex
New Construction
Sub-Bidding
Fort Pierce, FL 34981

Peabody Hall Dean of Students Renovation
Renovation - 13,100 SF
Sub-Bidding
Less than $3,075,000 est. value
Gainesville, FL 32603

Blount Center Expansion
Addition - 86,311 SF
Post-Bid
Less than $26,000,000 est. value
Gainesville, FL

Bryan Hall MEP Renovations Summer 2020
Renovation
Post-Bid
Tallahassee, FL

Construction Manager for the Renovation of Radio Station WQCS (Building Q) & Replacement of the Industrial Building (Building O)
Results
Fort Pierce, FL 34945

Construction Manager at Risk Football Center
New Construction - 264,000 SF
Results
Less than $32,500,000 est. value
Tampa, FL

The Malachowsky Data Sciences and Information Technology
- 260,000 SF
Construction
Less than $135,000,000 est. value
Gainesville, FL

B130 Center for Women and Men Remodel
Construction
Less than $1,740,000 est. value
Daytona Beach, FL 32114

New Building for School of Architecture
New Construction - 50,000 SF
Conception
Gainesville, FL

Build-Out of the HEC ICU SIM Lab
Renovation
Sub-Bidding
Pinellas Park, FL 33781

Last Updated 09/17/2020 11:41 AM
Project Title

Building V Addition and Renovation - St. Augustine Campus

Physical Address View project details and contacts
City, State (County) Saint Augustine, FL 32084   (Saint Johns County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,897,000
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project's primary scope of work includes a 5,685 gsf addition to the St. Augustine Campus existing Building V, a 7,510 gsf/6880 nsf Student Activity Center. A generous 270 days for contract time is scheduled for completion within one/single phase. Base Bid-Addition: generally includes site work (building prep/misc demolition, relocated potable water), minor renovation work (new access openings, new wall, and replace carpet two rooms with LVT), and the addition/new construction consisting of: steel beams/joists/deck, supported on architectural (CMU with moisture barrier stucco exterior) and interior column; concrete slab; barreltile on sloped roof over main floor area; modified bitumen on low roof section; stud gyp bd walls; storefront wall and entry systems, wood doors, and steel doors, and hardware incl access control; misc cabinetry; HVAC equipment installation (owner furnished) and associated duct work; and Electrical (lighting systems/equipment/security/FA). Bid Alternate 1-Flooring and Painting (renovation within the existing building), scope includes new LVT in most of the spaces and misc Carpet, as well as Painting (along w/ associated demo). Bid Alternate 2-Ceiling Work with associated Painting (renovation within the existing building), scope includes miscellaneous ceiling grid adjustment with above grid painting at those locations. Bid Alternate 3-Millwork (renovation within the existing building) includes display cabinets, counters, and enhancements for three column accents.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents