Similar Projects
Westwood Country Club Redevelopment - Master Plan
New Construction, Demolition, Alteration
Conception
$300,000,000 to $800,000,000 est. value
Amherst, NY

Dingens Warehouse
New Construction, Infrastructure - 150,000 SF
Conception
$15,000,000 CJ est. value
Buffalo, NY 14206

Walden Avenue Grocery Store
Renovation, Addition - 2,959 SF
Design
$1,500,000 est. value
Buffalo, NY 14211

NY 265; Kenmore Ave - Tonawanda Scl and NY 324; Delaware - Floradale
Infrastructure, Alteration
Design
$1,050,000 est. value
Tonawanda, NY 14223

Subbasement Excavation for Steam Repairs
Term Contract, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Buffalo, NY 14215

Parking Lot Repairs Buffalo
Infrastructure
Bidding
$500,000 CJ est. value
Buffalo, NY 14215

Highway Summer Maintenance Part 1 and Part 2
Term Contract
Post-Bid
NY

Milestrip Sidewalks
Alteration
Post-Bid
Less than $50,000 est. value
Orchard Park, NY 14127

Restoration of Campus Parking Lots at SUNY Buffalo
Results
Buffalo, NY 14260

Airport Pavement Maintenance 2021
Results
Less than $1,300,000 est. value
Cheektowaga, NY 14225

West Herr Automotive Group Car Dealership
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Hamburg, NY 14127

Taco Bell / Hamburg
Demolition, New Construction, Infrastructure - 2,200 SF
Pending Verification
$700,000 CJ est. value
Hamburg, NY 14075

Grain Mill Mixed-Use Development - Phase 2
Demolition, New Construction, Infrastructure
Conception
$75,000,000 CJ est. value
Buffalo, NY 14203

Installation of Concrete Sidewalk
Infrastructure
Design
$100,000 CJ est. value
East Amherst, NY 14051

George K Arthur Community Center Year 47 Facilities Improvements
Renovation, Infrastructure
Bidding
$640,000 CJ est. value
Buffalo, NY 14211

Last Updated 08/11/2022 04:11 PM
Project Title

Buell Avenue Parking Lot

Physical Address View project details and contacts
City, State (County) Cheektowaga, NY 14225   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project was previously let and awarded to a contractor. The work was partially completed and is now being rebid in its current condition with additional storm water scope. This reissued for bid scope of work provides guidance for completion of remaining work in the original project design, plus the new stormwater work after project suspension. Project Description: The project will develop a 3-1/2-acre parcel into two parking Lots. Parking lot one will be developed into a 100 parking space multipurpose lot serving both airport and NFTA Metro patrons by providing a parking lot that offers: o Park & Ride o Cell Phone Waiting o TNC Waiting Area (Lyft/Uber) o Metro Bus Stop Parking lot two will be developed into a 297 parking space Airport Employee lot. This lot will be secured by access-controlled barrier arms and monitored by video surveillance. The lot will include two waiting shelters. Note: Final parking space counts may vary based on constraints identified during design and construction. The NFTA reserves the right to waive irregularities, to reject any or all bids and to extend the bidding period. Bid security must accompany each bid and must be in an amount not less than ten percent of the total bid price if the base bid exceeds $50,000.00. Bid security may be submitted prior to bid opening either electronically utilizing Surety2000 at www.surety2000.com, or delivered to the NFTA in an opaque sealed envelope. Details for electronic submission are provided on the NFTA's Engineering Branch website. In the event a bidder utilizes an offline bid but provides bid security electronically the electronic bid bond number must be submitted with the offline bid. The Contractor shall perform not less than 50% of the Work with its own forces. The time of completion for the project is 310 calendar days (includes a winter shutdown) after receipt of the Notice to Proceed. (Phase 1 - Pump station/Storm Sewer work to be completed in Fall 2022. All remaining site work, Phase 2, to be completed by June 30, 2023.) Liquidated damages in the amount of $ 1,140 per calendar day will be assessed against the Contractor for its failure to complete the project within the time specified. The MWBE (Minority and Women-Owned Business Enterprises) and SDVOB (Service-Disabled Veteran Owned Business) Goals for 10BL1806 are as follows: MBE 18% WBE 12% SDVOB 3%.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents