Similar Projects
Augusta Bunton Pump Force Main
Post-Bid
$650,000 est. value
Willis, MI 48191

Multiple Blocks - Student Publications - Replace Water Service to Building Jenny Lessard
Post-Bid
Ann Arbor, MI 48109

Utility Structure and Concrete Repair
Term Contract
Results
Less than $12,280 est. value
MI

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Meter Replacement Program
Term Contract
Post-Bid
Sterling Heights, MI

Hangar 665 Expansion and Watermain Upgrades Project
Addition - 22,000 SF
Results
Less than $10,000,000 est. value
Gwinn, MI

T4: Infrastructure
Post-Bid
Highland, MI

As Needed Water Main Break Repairs
Term Contract
Results
Plymouth, MI 48170

Annex Building Water Main and Fire Supression
Post-Bid
Detroit, MI

Z1da--Correct Water Distribution Deficiencies Legionella 515-18-107
Results
$2,000,000 to $5,000,000 est. value
Battle Creek, MI 49037

M-21 (Lincoln Ave) Water Main, M-66 (State Street) to Baldie Street
Results
Ionia, MI 48846

Utility Pavement Repair Program 2020-2023
Results
Hamtramck, MI

Z--Pendills Influent Water Pipeline
Results
$1,000,000 to $5,000,000 est. value
Brimley, MI

Richland Gardens Area Water Main project
Results
Less than $4,021,000 est. value
Farmington, MI 48336

Everett High School Water Main Improvements
Results
Lansing, MI 48933

Last Updated 03/30/2022 07:39 AM
Project Title

2022 Miscellaneous Water Work

Physical Address View project details and contacts
City, State (County) Kalamazoo, MI   (Kalamazoo County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This contract includes, but is not limited to: All work as shown on the drawings and described in the specifications for miscellaneous water work such as: large taps, hydrants, small service maintenance, valves, main repair, line stops & valve insertions, restoration, and associated work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents