Similar Projects
Additional Lanes on SR-261 From Beardon Rd to Sr-3 (US-31) - ALDOT
New Construction, Infrastructure
Conception
$27,129,000 CJ est. value
Alabaster, AL 35007

Classroom and Storage Facility at Firehouse #2 - City of Alabaster
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Alabaster, AL 35007

Montevallo Water Treatment Plant - Residential and Commercial Water Meters
Infrastructure
Design
$9,500,000 CJ est. value
Montevallo, AL 35115

District 31 Shopping Center - Phase 1 & 2
New Construction, Infrastructure - 350,000 SF
Design
$75,000,000 CJ est. value
Alabaster, AL 35007

Inverness Center Drive Sidewalk Phase I
Infrastructure
Bidding
$400,000 CJ est. value
Hoover, AL 35242

Alabaster Boulevard Pavement Remediation
Infrastructure
Bidding
$600,000 CJ est. value
Alabaster, AL 35007

American Village Independence Hall & Congress Hall Project
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Montevallo, AL 35115

Oak Mountain Trail Mass Grading
Infrastructure
Post-Bid
Pelham, AL

Appleford Sidewalk Repairs
Infrastructure
Results
$50,390 CJ est. value
Helena, AL 35080

Roadway and Utility Improvements Chelsea ABC Site
Infrastructure
Results
$573,230 CJ est. value
Chelsea, AL 35043

Ascension St. Vincent's McCain Parkway Hospital
New Construction, Infrastructure - 40,000 SF
Pending Verification
$35,000,000 CJ est. value
Pelham, AL 35124

Blackridge South Phase 1
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hoover, AL 35080

WWTP Property Expansion/ Site Upgrades - City of Alabaster
New Construction, Infrastructure
Conception
$1,900,000 CJ est. value
Alabaster, AL 35007

$PRESS - Police Station - Williams Blackstock Architects
New Construction, Infrastructure - 35,000 SF
Design
$12,000,000 CJ est. value
Alabaster, AL 35007

Parking Lot Improvements to Creekview Elementary School
Infrastructure
Bidding
$500,000 CJ est. value
Alabaster, AL 35114

Last Updated 03/16/2023 09:15 AM
Project Title

Woodford Wastewater Pumping Station Upgrade

Physical Address View project details and contacts
City, State (County) Birmingham, AL 35242   (Shelby County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work of constructing the improvements will be let under one (1) Contract, if an award should be made, and the City of Hoover reserves the right to select the Bid considered to be in their best interest. The major items of work to be performed are to include the installation of an 8' diameter precast wetwell complete with dual submersible pumps and a diesel-powered standby pump with suction/discharge piping, reinforced concrete foundation, yard piping, electrical, instrumentation, removal of UST, filling of abandoned drypit underground pumping station enclosure, removal of existing wastewater pump, and all general site work, grading, landscaping, and fencing, according to the Drawings, Specifications, and Contract Documents. All items are to be furnished and installed by the Contractor. No bid proposal shall be accepted after the time stated for receiving bid proposals in this notice. Sealed envelopes containing contractor's bid proposals must prominently display the bid # and project name, name and address of the firm, and the contractor's Alabama license number with the date of renewal on the front of the envelope. These requirements shall not be waived. The Contractor is hereby advised that TIME IS OF THE ESSENCE on this project. The Contract Time for this project is 230 consecutive calendar days. Liquidated damages will be assessed if the time limit is exceeded. The Contractor may apply for an extension of time in accordance with the provisions of the Contract; however, such an extension must be approved prior to the Contract Completion Date to avoid the imposition of liquidated damages. The city of hoover hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises (DBES) will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, gender, religion, age, disability, marital status or national origin in consideration for an award.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents