Similar Projects
Myrtle Beach International Airport Capital Improvements
New Construction, Renovation, Addition
Conception
Myrtle Beach, SC 29577

Nelson Property Group Residential
New Construction - 7,400 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Rock Hill, SC

Spencer's Trail
New Construction
Design
Anderson, SC

Ashley River Tower Facade Repairs
Alteration
Bidding
Charleston, SC

Public Works Campus Site Improvements
Infrastructure
Bidding
Aiken, SC 29801

RCRC Site Work Friarsgate
Term Contract
Post-Bid
SC 29063

Stormwater Projects
Post-Bid
Easley, SC 29640

Site Clearing and Grubbing of 18 Acres with 4 Sediment Traps
Results
Camden, SC 29020

Lowcountry Lowline Affordable Housing Site
Results
Charleston, SC 29401

Luxury Rv Park
New Construction
Construction
Bluffton, SC

On Time Distribution
Renovation
Pending Verification
Manning, SC 29102

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Bidding

Flooring Replacement Administrative Building
Post-Bid
Florence, SC 29501

Barnwell Fuller Park Splash Pad/Playground - Sitework
Results
$30,000 to $50,000 est. value
Barnwell, SC 29812

USPS - Simpsonville, SC - MPO - Building Expansion
Renovation, Addition
Post-Bid
$2,500,000 to $2,700,000 est. value
Simpsonville, SC

Reported 03/25/2022 03:29 PM
Project Title

Whittemore Elementary School Property

Physical Address View project details and contacts
City, State (County) Conway, SC   (Georgetown County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Request for Proposals is for development proposals for a 10-acre site at the Southeast corner of Horry Street and Maple Avenue in Conway. On the site currently are two former school buildings, one approximately 34,500 square feet and the other approximately 10,000 square feet. Both buildings currently stand condemned by the City’s building official. Building materials on the site include asbestos.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central HVAC Equipment.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents