Similar Projects
Monument Subdivision
New Construction
Conception
Noblesville, IN 46062

Mixed Use Development
New Construction - 247,000 SF
Conception
$200,000,000 est. value
Carmel, IN 46082

Village of Federal Hill
New Construction - 31,700 SF
Design
$35,000,000 est. value
Noblesville, IN 46062

Union Square Mixed-Use Development
New Construction - 80,000 SF
Design
$65,000,000 est. value
Westfield, IN 46074

Bridge Rehabilitation or Repair
Infrastructure
Bidding
$7,448,224 CJ est. value
Noblesville, IN 46062

Bridge Rehabilitation or Repair
Infrastructure
Bidding
$7,448,224 CJ est. value
Noblesville, IN 46062

Technology Drive Rehab
Infrastructure
Post-Bid
Fishers, IN 46038

Olio Road Driveway Improvements
Infrastructure
Post-Bid
Fishers, IN 46085

Cherry Tree Rd Guardrail End Treatment / OS Replacement
Results
Noblesville, IN 46060

I-70 Design-Build Added Travel Lanes and Pavement Replacement from SR-1 to IN/OH State Line
Infrastructure
Results

Courtyards of Carmel Single Family Homes
New Construction - 1,712 SF
Construction
Carmel, IN

Chatham Pointe Subdivision
New Construction
Construction
Westfield, IN

Woods Robinson Briggs
New Construction, Infrastructure - 318,000 SF
Pending Verification
$100,000,000 CJ est. value
Westfield, IN 46074

Woods Robinson Briggs
New Construction, Infrastructure - 318,000 SF
Pending Verification
$100,000,000 CJ est. value
Westfield, IN 46074

Monon 30 Mixed-Use Development
New Construction - 25,000 SF
Conception
$100,000,000 est. value
Indianapolis, IN 46213

Last Updated 02/20/2023 11:16 AM
Project Title

PRESS - Gramercy East - David Weekley Homes

Physical Address View project details and contacts
City, State (County) Carmel, IN 46032   (Hamilton County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Parking Garage, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Design Development
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

483 apartments proposed at Gramercy East development Developers have filed plans to remove 112 units at the Gramercy apartment complex on City Center Drive and replace them 483 units in three new four-story buildings. Gramercy East is planned south of City Center Drive and west of Keystone Parkway. (Submitted image) The development proposal by Buckingham Properties also includes a 258-space parking garage and community leasing amenity center. The new buildings are planned on 22.9 acres known as Gramercy East, just east of the Gramercy West residential community being developed by David Weekley Homes. Current has reached out to the developer team for comment.

Details

Demolition, Demolition. 4 Stories Above Grade, New Construction, New Construction. Parking Spaces, 258 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Residential Equipment, Residential Appliances.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents