Similar Projects
Advanced Technology Precast Concrete Hollow Core Planks
Alteration
Post-Bid
Grayslake, IL 60030

Advanced Technology Center Site Concrete and Asphalt
Infrastructure, Alteration
Results
Gurnee, IL 60031

Concrete Work - Zion Fire Station #2
Alteration
Results
Zion, IL 60099

2022 Concrete Flatwork
Alteration
Results
Lake Zurich, IL

2022 Stamped Concrete Replacement
Alteration
Results
Grayslake, IL

Balzer Park Poured In Place Playground Surface
Renovation, Infrastructure
Results
Lincolnshire, IL 60069

Basketball and Tennis Court Surface Repair and Color Coating
Infrastructure
Results
$127,400 CJ est. value
Gurnee, IL 60031

Fire Station #1 Concrete Pad Replacement
Renovation, Alteration
Results
$20,000 est. value
Libertyville, IL 60048

Systemwide Pavement Marking
Infrastructure
Results
$2,994,666 CJ est. value
Chicago, IL 60652

Concrete Replacement Station 20
Alteration
Results
$75,000 est. value
Deerfield, IL 60015

Precast Concrete Vaults for Duck Farm DEA
Term Contract
Post-Bid
Lake Villa, IL 60046

Bridge Reconstruction, Roadway Widening, Resurfacing and ADA Improvement
Infrastructure
Results
$8,715,212 CJ est. value
Lake Villa, IL 60046

2023 Renovations at Antioch Upper Grade School
Renovation
Post-Bid
$3,000,000 CJ est. value
Antioch, IL 60002

Lake County Tech Campus - 2023 Renovations
Renovation
Post-Bid
$250,000 CJ est. value
Grayslake, IL 60030

Regional Operations & Communication Facility
New Construction, Infrastructure - 38,000 SF
Bidding
$1,500,000 CJ est. value
Libertyville, IL 60048

Last Updated 02/20/2023 02:24 PM
Project Title

2023 Sidewalk Improvements Project

Physical Address View project details and contacts
City, State (County) Buffalo Grove, IL 60089   (Lake County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $243,701 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This Project Includes, but is Not Limited to, the Following Major Work Items: Concrete Sidewalk Removal and Replacement; Driveway Pavement Removal and Replacement; and Other Appurtenant Work on Various Street Segments Throughout the Village Limits. State of Illinois, Department of Transportation, Contractor Pre-qualification and Subcontractor Pre-qualification/registration is Required. Bid Security in the Form of a Bid Bond, Bank Cashier's Check or Certified Check in the Amount of Five (5) Percent of the Total Bid Amount Made Payable to the Village of Buffalo Grove Shall Accompany the Bid. This Work is Subject to the Wage Provisions of the Illinois Prevailing Wage Act. 820 Ilcs 130/0/01 Et Seq. And the Illinois Substance Abuse Prevention on Public Works Projects Act. 820 Ilcs 265/1 Et Seq Relative to Prevailing Wages of Laborers, Mechanics, and Other Workers Employed in Any Public Works as Amended by Public Acts 86799 and 86693. The Village of Buffalo Grove Reserves the Right to Reject Any and All Bids and Bidders and to Waive All Technicalities. All Bid Proposals Submitted Shall Be Valid for a Period of One Hundred Twenty (120) Days. The Village Reserves the Right to Award to Any Bidder Based on Negotiation With Any and All Bidders After Receipt of Bids.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents