Similar Projects
Residential Roof Repair for Ten (10) Houses
Post-Bid
Macon, GA

IDIQ Roofing
Post-Bid
$5,000,000 to $10,000,000 est. value
Hinesville, GA 31314

Roof Repair /Replacement
Results
$25,000 to $100,000 est. value
Hinesville, GA 31314

Roof and Window Replacement
Results
Less than $34,000 est. value
GA

Roof - Jenkins County Health Department
Post-Bid
Millen, GA

City Hall Roof/Building Repair
Results
Less than $11,300 est. value
Blue Ridge, GA

RCPS Central Office Complex Site and Roof
Post-Bid
Conyers, GA

Savannah State University Herty Hall Roof Replacement
Results
Less than $235,000 est. value
Savannah, GA 31404

Paulson Athletic Building Roof Repairs
Post-Bid
Savannah, GA 31401

Roof Replacement at Friendship Road Elementary School
Results
Buford, GA 30519

Roof Replacement for 2005 S. Main and 205 E. Jefferson
Post-Bid
Madison, GA

Replace Roof at Macon Water Authority’s Support Services Building
Results
Macon, GA 31202

Roof Repair Terrell Street
Results
Metter, GA 30439

Depot Roof Reconstruction
Results
Pelham, GA

Cedartown High School Roof
Results
Cedartown, GA 30125

Last Updated 02/22/2020 08:38 PM
Project Title

Roofing Improvements

Physical Address View project details and contacts
City, State (County) GA   (Washington County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Thorough cleaning and preparation of roof for new surfacing.A moisture survey shall be completed to confirm that the roof is suitable for proposed materials. Any severely water damaged or deteriorated areas shall be removed and replaced.All flashing to be sealed with silicone and fastened with screws.Roof and parapet walls shall be coated with at least two (2) coats of 100% silicon reflective roof coating, using GAF, GACO, or identical material that is equivalent in quality and warranty.Application rate of 1.0 to 1.5 gal per sf per coat, with application temperature between 32F and 100F.Following the drying of the first coat, a second coat shall be applied. 24 hours shall not elapse between the two coatings.Specified dry membrane thickness of 38 mils in the field of the roof. Any area deemed unsatisfactory must be repaired. All curb flashings, 26-gauge metal, shall be flashed with at least 6 inches width of Roof Mate Fabric and Unisil HS, or identical material that is equivalent in quality and warranty.Existing pipe penetrations shall be sealed with new boots installed.Top and bottom of pipe boots shall be flashed using Roof Mate Fabric and Unisil HS, or identical material that is equivalent in quality and warranty.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents