Similar Projects
Installation of a High Efficiency Gas Fired Summer Winter Phased Boiler System
Post-Bid
Penndel, PA 19047

Designing a New HVAC System to Replace the Existing Boiler and Air Handling System
Post-Bid
North Huntingdon, PA 15642

CCM Coordinate Measuring Machine & Install
Results
Tobyhanna, PA 18466

H144--Coatesville and Lebanon VAMC Boiler and Chiller Water Treatment
Results
Coatesville, Lebanon, PA 17042

Sand Spring Wastewater Treatment Plant Upgrades- General/Process Mechanical
Construction
Less than $3,000,000 est. value
Schnecksville, PA 18078

H245--Boiler Safety Device Testing
Post-Bid
Coatesville, Erie, PA 19320

Harris Township Maintenance Facility - Mechanical
Results
Less than $175,400 est. value
Boalsburg, PA 16827

H245--Boiler Safety Device Testing
Post-Bid
Wilmington, DE - Altoona, Coatesville, Erie, PA

Security Vestibules for Commodore Perry Schools (Mechanical Construction)
Results
Hadley, PA 16430

Incidental Mechanical Repairs
Term Contract
Post-Bid
Johnstown, PA 15907

Midvale Depot HVAC and Roof Replacement- Mechanical Construction
Results
Philadelphia, PA 19144

Replacement of Boilers and Domestic Hot Water Heaters
Post-Bid
Scranton, PA 18509

Annual Boiler/Burner Maintenance and Tuning
Term Contract
Results
Quakertown, PA 18951

35DEP Mechanical Maintenance Services
Post-Bid
Harrisburg, PA

Wastewater Treatment Plant Phase II - Mechanical Construction
Results
$100,000 to $125,000 est. value
Greencastle, PA 17225

Reported 01/27/2022 12:00 AM
Project Title

SCI Somerset - Upgrades to Mechanical Systems

Physical Address View project details and contacts
City, State (County) Somerset, PA   (Somerset County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Estimated Range: 1 General – $100,000 - $200,000. 2 HVAC – $4,000,000 - $5,000,000. 3 Plumbing – Under $100,000 & 4 Electrical – $400,000 - $500,000. The Goals for each Prime Contract is as follows: 1 General Construction – ALL BASE BIDS (#1, #2 & #3) SDB = NA VBE = NA 2 HVAC Construction – ALL BASE BIDS (#1, #2 & #3) SDB = 7% VBE = 3% 3 Plumbing Construction – ALL BASE BIDS (#1, #2 & #3) SDB = NA VBE = NA 4 Electrical Construction ALL BASE BIDS (#1, #2 & #3) SDB = 11% VBE = 3%

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Humidity Control Equipment, Mechanical Dehumidification Units, Outdoor, Mechanical Dehumidification Units, Indoor, Mechanical Dehumidification Units.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents