Similar Projects
Traffic Signal Upgrades 2017/2018
Term Contract
Post-Bid
Less than $250,000 est. value
Salt Lake City, UT 84111

Eagle Mountain Boulevard Traffic Signal at Aviator Avenue
Post-Bid
Eagle Mountain, UT

US-40 and 1500 South (MP 141.37), Vernal Traffic Signal
Results
$500,000 to $1,500,000 est. value
UT

800 North 800 East Traffic Signal - CM/GC
Results
$1,600,000 to $1,800,000 est. value
Spanish Fork, UT 84660

Vineyard City High Intensity Activated Crosswalk Signal
Post-Bid
Vineyard, UT

Construction of the 700 South 200 East Traffic Signal
Results
Saint George, UT 84770

Traffic Signal Modular Cabinet Assemblies- Stage 1
Post-Bid

Rectangular Rapid Flashing Beacon
Results
Salt Lake City, UT

Vehicular Traffic Signal Heads
Post-Bid
Salt Lake City, UT 84114

2020 Traffic Improvements
Results
$160,000 to $180,000 est. value
Orem, UT

Providing and Maintaining Temporary Traffic Control Devices
Term Contract
Post-Bid

US-89 Gunnison to Manti
Results
$6,000,000 to $1,000,000 est. value
UT

Lone Tree Traffic Signal
Post-Bid
Eagle Mountain, UT 84005

SR-204; Dual Left NB at US-89 Other - Traffic Management and ITS Projects
Results
$500,000 est. value
UT

Airport Road Traffic Signal - New Roadway and Intersection
Post-Bid
Eagle Mountain, UT

Last Updated 11/17/2021 06:00 AM
Project Title

I-80; MP 60 To 70 and 80 To 88.58

Physical Address View project details and contacts
City, State (County) UT   (Tooele County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 to $15,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items of work are as follows (for all items of work see attachment): SMA - 1/2 inch Roto milling - 1 1/2 Inch Asphalt Pavement Soft Spot Repair 10 ROADWAY Base 1 00830701U On the Job Training 200 Hour 2 015017010 Mobilization 1 Lump 3 01540701 3rd Party Public InformationServices1 Lump 4 015547005 Traffic Control 1 Lump 5 01557701 Maintenance of Traffic 1 Lump 6 01721701 Survey 1 Lump 7 027217030 Untreated Base Course -Shouldering209,622 ft 8 027377001 Asphalt Pavement Soft SpotRepair5,250 cu yd 9 027377002 UTBC Soft Spot Repair 2,215 cu yd 10 027377003 Borrow Soft Spot Repair 2,215 cu yd 11 02741705 HMA - 1/2 inch 484 Ton 12 02744704 SMA - 1/2 inch 79,850 Ton 13 02748704P Emulsified Asphalt CQS-1 467 Ton 14 02761702P Longitudinal Rumble Strip -Asphalt140,980 ft 15 02761703P Continuous Longitudinal RumbleStrip - Asphalt195,304 ft 16 02764710 Thermal Imaging and RollerMapping933,914 sq yd 17 028427010 Delineator Type I 375 Each 18 028427020 Delineator Type II 126 Each 19 02961702P Rotomilling - 1 1/2 Inch 933,914 sq yd 20 02983701 Grinding for Grooved-InPavement Markings651,783 ft 21 02983703 Grinding for Grooved-InPavement Messages12 Each 22 022257010 Asphalt Surfacing Removal(Structures)5,820 sq yd 23 031527053 Relief Joint Sealing 655 ft 24 033927030 Parapet Sealing 2,310 ft 25 03934701P Structural Pothole Patching 5,775 sq ft 26 03936700 Approach Deck Repair 385 sq ft 27 071057010 Waterproofing Membrane 52,295 sq ft 28 02765705 Pavement Marking Paint 5,470 gal 29 027687110 Pavement Message (PreformedThermoplastic Stop Line,Crosswalks - 12 inch)12 Each 30 028917020 Sign Type A-1 45 sq ft 31 028917075 Sign Type A-2 291 sq ft 32 028917270 Remove Sign Less Than 20Square Feet8 Each 33 028917300 Small Sign Tubular Steel PostBase (B1)2 Each 34 028917320 Slipbase Sign Base (B3) 22 Each 35 028917360 Sign Post P2 2 Each 36 028917365 Sign Post P3 22 Each 37 00221700 Contract Time - Time Segment 1 Time Range: 100 -130Cal d

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents