Similar Projects
UO Retainer Program - Consulting Services - Extended Period
Renovation, Term Contract
Bidding

Flow Augmentation Water Quality Trading Plan for Excess Thermal Load
Infrastructure
Bidding
Ashland, OR

Engineering, Planning and Development
Post-Bid

Wastewater Treatment Plant in Vessel Composting Feasibility
Infrastructure
Post-Bid
Ashland, OR

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

2021-03 N Mountain Ave Overlay - I-5 to E Main Design and Construction Services
Infrastructure
Results
Ashland, OR 97520

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Bear Creek Greenway Revisioning Plan
New Construction, Infrastructure
Results
Central Point, OR

FAA Airport Traffic Control Tower Design Competition
New Construction
Post-Bid

Ashland Community Center and Pioneer Hall Improvements
New Construction, Infrastructure
Results
Ashland, OR 97520

ODA Aviation Engineering Services Consulting Services (Engineering/Inspection and Ca) Airport Specific
Infrastructure
Post-Bid

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Post-Bid
Less than $98,000,000 est. value

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

Public Works Energy A-E Services - Worldwide
Renovation
Post-Bid
$40,000 to $3,000,000 est. value

Reported 03/24/2022 12:00 AM
Project Title

Wildfire Mititgation Plan

Physical Address View project details and contacts
City, State (County) Ashland, OR   (Jackson County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To produce a Wildfire Mitigation Plan (WMP) for the City’s electric utility. The purpose of the WMP is to review, capture and catalog existing utility wildfire policies and procedures. The resulting plan will incorporate existing work to provide strategies to minimize the risk of damage to and from electrical lines and equipment. The WMP will be used to benchmark ongoing efforts and strategies to maintain safe and reliable electric utility system operations.

Details

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents