Similar Projects
Raleigh Storm Drainage Improvement Project - City of Charlotte
Infrastructure
Conception
Charlotte, NC 28263

Beckwith/Meadow Storm Drainage Improvement Project Phase 1 - City Of Charlotte
Infrastructure
Conception
$5,850,000 est. value
Charlotte, NC

Perth/Milton SDIP- City of Charlotte
Infrastructure
Design
$5,575,000 est. value
Charlotte, NC 28215

Chatham SDIP - City of Charlotte
Infrastructure
Design
$9,655,000 est. value
Charlotte, NC 28205

Leak Detection Services
Infrastructure
Bidding
Charlotte, NC

The Pearl (Pearl Innovation District) Bid Packages 2-4 (Charlotte Water, Water and Sanitary Sewer; Mass Grading; Local Storm and Roadways)
Infrastructure
Bidding
$200,000 est. value
Charlotte, NC 28204

Waterline Break Sediment Cleanup Service
Infrastructure
Post-Bid
Huntersville, NC 28078

Construction of Gem Street Extension
Infrastructure
Post-Bid
Cornelius, NC 28031

Progressive Design-Build Services for Pipeline Projects
Results
NC

Catawba Pump Station Rehabilitation Project
Results
Charlotte, NC 28216

Eastway Storm Drainage Improvement Project - City of Charlotte
Infrastructure
Conception
$3,900,000 est. value
Charlotte, NC 28202

FY23 Small Diameter Water/Sewer Service Contract 2
Infrastructure
Bidding
$600,000 est. value
Charlotte, NC

Progressive Design-Build Services for the Clarke Creek Pumping Station and Force Main Project
New Construction, Infrastructure
Post-Bid
Charlotte, NC

FY21 Water Main Replacement - Contract 3
Results
$800,000 est. value
Charlotte, NC

Reece Storm Drain Improvement Project - City Of Charlotte
Infrastructure
Conception
Less than $1,900,000 est. value
Charlotte, NC 28209

Reported 07/06/2022 08:16 AM
Project Title

Dixie Berryhill Water and Sewer Projects - City of Charlotte

Physical Address View project details and contacts
City, State (County) Charlotte, NC   (Mecklenburg County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $3,920,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Charlotte, North Carolina. Conceptual plans call for site work for a water / sewer project. In 2003, City Council adopted the Dixie Berryhill Strategic Plan, a detailed economic development, land use, and design plan for the area west of CLT Airport (between the Catawba River and I-485) to encourage "high quality mixeduse development" and support transit. Charlotte Water's Dixie Berryhill projects include various water and sewer pipeline and pump station projects, all in support of additional development expected in the area over the next 20 to 30 years. As of July 05, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents