Similar Projects
Backflow Prevention Assemblies and Fire Hydrants
Term Contract
Results
FL

Wastewater Interconnect with City of Eustis
Results
Less than $5,500,000 est. value
Umatilla, FL 32784

Lake Frances Estates Water and Wastewater System Improvements
Results
Less than $6,718,402 est. value
Tavares, FL

Hickory Head Valves and Actuators
Infrastructure
Results
The Villages, FL 32159

Pneumatic Piping Installation
Infrastructure
Results
Tavares, FL

Palatlakaha River Villa City Water Control Structures Replacement
Results
Tavares, FL

Water Main and Meter Replacement
Results
$1,250,000 est. value
Yalaha, FL 34797

Woodward Avenue Road and Utility Improvements
Results
Less than $500,000 est. value
Eustis, FL 32726

Intent to Utilize Seminole County Contract for Hydrant and Valve Services
Term Contract
Results
Clermont, FL

Water Main and Sidewalk Improvements - CDBG
Results
Clermont, FL

Intent to Utilize Seminole County Contract for Replacement of Water Meters
Term Contract
Results
Clermont, FL 34712

6815 CR 48 Reuse Extension - Spring Creek
Results
$110,000 to $140,000 est. value
Leesburg, FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Mandarin Road Loop Water Main Connection
Results
Less than $356,435 est. value
Jacksonville, FL 32223

Installation of 6-Inch Pipeline at the Nutrient Reduction Facility
Infrastructure
Post-Bid
Mount Dora, FL 32757

Reported 08/24/2021 11:37 AM
Project Title

Cottonwood Fire Protection Improvement

Physical Address View project details and contacts
City, State (County) Leesburg, FL 34748   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $528,175
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors with experience in water main and fire protection work. Work consists of the method and process for furnishing all labor, supervision, materials, tools, equipment, and incidentals, necessary to provide for the expansion of a six inch (6") water main to an eight inch (8") water main with the addition of fire hydrants, and replacement of service points of connection. The following streets generally describe the location of this project: Cottonwood Street, Miller Street, Boyle Street, Cedar Street, Cypress Street, Palmetto Street, and Gibson Street.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents