Similar Projects
Reported | 04/01/2022 12:00 AM |
Project Title | Hurricane Stormwater Repairs Project |
Physical Address | View project details and contacts |
City, State (County) | Maxton, NC (Robeson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of repairs to multiple areas impacted by Hurricane Florence based on an assessment conducted by the Department of Homeland Security’s Federal Emergency Management Agency (FEMA). These areas include the drainage ditch between Kincaid St and Malloy St, extending ± 120’ downstream of Malloy St (Site #1), the town drainage culvert extending from the west side of N McNair St to the east side of Kincaid St (Site #2), the Kincaid St culvert (Site #3), and the Malloy St Culvert (Site #4). Scope of work associated with Site #1 will consist of excavation and removal of deposited soils in the channel and stabilization of channel embankments. Site #2 will consist of backfilling multiple sink holes along the drainage culvert alignment. Site #3 will consist of stabilizing the downstream embankment of Kincaid St with permanent turf reinforcement matting. Site #4 will consist of the removal and replacement of asphalt pavement and concrete curb and gutter and flumes along Malloy St. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |