Similar Projects
Resurfacing, Milling and Pvt. Mkgs. - NC 41 and NC 71
Infrastructure
Bidding
NC

Resurfacing, Widening, Milling, Shoulders and Pavement Markings
Infrastructure
Bidding
NC

Emergency Watershed Protection - Gumbo Branch Channel Clearing
Post-Bid
Less than $175,000 est. value
Saint Pauls, NC

Blue Ridge Parkway
Post-Bid
$85,000,000 est. value

I-6064A,B and C / I-5879 I-95 Widening and Pavement Rehabilitation from I-74 (Exit 13) to South of US 301 (Exit 22) and I-95 / SR 1536 (Carthage Road) Interchange Improvements
Results
NC

Tanglewood Drainage Improvements
Results
Lumberton, NC

North Wilkinson Drive Storm Drainage Repairs
Post-Bid
Saint Pauls, NC 28384

Widening, Grading, Paving, Drainage and Structure - SR 1515 - Robeson
Results
Pembroke, NC 28372

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Paving Services
Results
Lumberton, NC 28360

I-74/I-95 Industrial Park
Infrastructure
Post-Bid
Lumberton, NC

Aluminum Box Culvert
Results
Lumberton, NC 28360

Corrugated Aluminum Pipe
Infrastructure
Post-Bid
Lumberton, NC 28360

Aluminum Box Culvert
Results
Lumberton, NC 28360

Patching, Overlays and Widening
Term Contract
Results
NC

Reported 04/01/2022 12:00 AM
Project Title

Hurricane Stormwater Repairs Project

Physical Address View project details and contacts
City, State (County) Maxton, NC   (Robeson County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of repairs to multiple areas impacted by Hurricane Florence based on an assessment conducted by the Department of Homeland Security’s Federal Emergency Management Agency (FEMA). These areas include the drainage ditch between Kincaid St and Malloy St, extending ± 120’ downstream of Malloy St (Site #1), the town drainage culvert extending from the west side of N McNair St to the east side of Kincaid St (Site #2), the Kincaid St culvert (Site #3), and the Malloy St Culvert (Site #4). Scope of work associated with Site #1 will consist of excavation and removal of deposited soils in the channel and stabilization of channel embankments. Site #2 will consist of backfilling multiple sink holes along the drainage culvert alignment. Site #3 will consist of stabilizing the downstream embankment of Kincaid St with permanent turf reinforcement matting. Site #4 will consist of the removal and replacement of asphalt pavement and concrete curb and gutter and flumes along Malloy St.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents