Similar Projects
ADA Ramp and Mat Improvements
Infrastructure
Design
$2,731,702 CJ est. value
Cape Coral, FL 33904

ADA Ramp and Mat Improvements
Infrastructure
Design
$2,731,702 CJ est. value
Cape Coral, FL 33904

Big Carlos Pass Bridge Construction
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Fort Myers, FL 33901

Big Carlos Pass Bridge Construction
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Fort Myers, FL 33901

10th Street North Landscape and Irrigation Improvements
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Naples, FL 34103

10th Street North Landscape and Irrigation Improvements
Infrastructure
Sub-Bidding
$500,000 CJ est. value
Naples, FL 34103

Pelican Bay Sidewalk Replacement Phase 1
Post-Bid
$709,000 est. value
Naples, North Naples, FL

Decorative Street Light Components
Post-Bid
Bonita Springs, FL

Fakahatchee Strand Preserve State Park - Big Cypress Parking Improvements
Results
$4,800,000 est. value
Copeland, FL 34137

Annual Concrete Sidewalk, Driveway, Curb, and Gutter Repairs
Term Contract
Results
Fort Myers, FL 33901

Temple Shalom Community Facility - Sitework
New Construction
Construction
$100,000 est. value
Naples, FL 34116

Multi Commercial Development - Sitework
Infrastructure
Construction
Lehigh Acres, FL 33971

Cape Coral Yacht Club Renovations - City of Cape Coral
Infrastructure
Pending Verification
$60,000,000 CJ est. value
Cape Coral, FL 33904

St. Matthew's House Renovation
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Naples, FL 34112

Sidewalk/Milling and Resurfacing/Base Work
Infrastructure
Design
$4,361,899 CJ est. value
Everglades City, FL 34139

Last Updated 08/01/2022 03:07 PM
Project Title

RFP D/B - Safety Improvement Projects, Collier and Lee Counties

Physical Address View project details and contacts
City, State (County) Cape Coral, FL 33909   (Lee County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $2,197,061 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Selection Method : Low Bid AREHNA PROJECT NO. M-21-046.005 - SITE 3 Response Requested : Bid Proposal / Technical Financial Management Numbers : 44626715201 44788415201 44914015202 Safety Improvement Projects, Lee and Collier Counties TRC Members (Subject to Change) : Gerald Byrne Katherine Chinault Walter Breuggeman The Florida Department of Transportation (FDOT) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the design, permitting and construction of three (3) safety improvement projects located within Collier and Lee Counties. FPID 447884-1-52-01 establishes a raised median for access management purposes and intersection improvements along SR 867 from Cypress Lake Drive to Edinburgh Drive in Lee County. FPID 446267-1-52-01 replaces the existing traffic signal on US 41 at the Crystal Drive intersection in Lee County. FPID 449140-1-52-01 adds a new pedestrian hybrid beacon signal at the existing SR 84 pedestrian crossing for the Rich King Memorial Greenway Trail in Collier County. Estimated Contract Time: 600 Days All questions for this project must be submitted through the Department's Bid Question and Answer website LBDB Qualification Validation Form Due Date 6/03/2022 Tech Proposal Due Date/Time 6/06/2022 Bid Price Due Date/Time 6/06/2022 Bid Opening Date/Time 6/06/2022 Technical Review Committee Meeting 1 Date/Time 6/09/2022 Final Selection Date/Time 6/14/2022 FDOT - RFP D/B - Safety Improvement Projects, Lee and Collier Counties Safety Improvement Projects, Lee and Collier Counties The Florida Department of Transportation (FDOT) has issued this Request for Proposal (RFP) to solicit competitive bids and proposals from Proposers for the design, permitting and construction of three (3) safety improvement projects located within Collier and Lee Counties. FPID 447884-1-52-01 establishes a raised median for access management purposes and intersection improvements along SR 867 from Cypress Lake Drive to Edinburgh Drive in Lee County. FPID 446267-1-52-01 replaces the existing traffic signal on US 41 at the Crystal Drive intersection in Lee County. FPID 449140-1-52-01 adds a new pedestrian hybrid beacon signal at the existing SR 84 pedestrian crossing for the Rich King Memorial Greenway Trail in Collier County.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents