Similar Projects
Reported | 01/07/2022 12:00 AM |
Project Title | Design/Build Services for Route 146 Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | Providence, RI 02912 (Providence County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Design-Build. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Procure Best Value Design-Build (BVDB) services for the Bridge Group 96: Rt. 146 Reconstruction project. The RI-146/I-295 corridor functions primarily as a limited access freeway that carries more than 171,000 vehicles every day. This project has several major components, the most important of which is reconfiguring the interchange at RI-146 and Sayles Hill Road in North Smithfield, RI (a limited stretch of the facility in which there is no access control and a major signalized intersection). In addition, this project will eliminate a dangerous weave at the intersection of RI-146 and Route 99 and replace a dangerous U-turn ramp at the intersection of RI-146 and RI-146A with a diverging diamond interchange (DDI), preserving all existing traffic movements while improving traffic flows throughout the corridor. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |