Similar Projects
Pharmacy and Laboratory Hood Maintenance and Certification Rooms and Hoods at FM/HS - BH
Term Contract
Design
Hot Springs, SD 57747

Cottages Heating Upgrade
Alteration
Bidding
$818,330 est. value
Redfield, SD 57469

Air Conditioning Installation South Park Elementary School
Post-Bid
Belle Fourche, SD 57717

HVAC Preventative Maintenance/Service
Post-Bid
Spearfish, SD

Beulah Williams Library Heating System
Results
Aberdeen, SD 57401

Dacotah Hall HVAC Upgrades
Results
Aberdeen, SD 57401

Brown High School Indoor Air Quality HVAC Upgrade Project
Alteration
Post-Bid
Sturgis, SD 57785

Meadows South Building Skin and HVAC Repairs
Results
Brookings, SD 57007

Make-Up Air Unit - Design/Purchase/Installation
Alteration
Post-Bid
Mitchell, SD 57301

Install Ionization Units Flandreau Indian School
Results
Flandreau, SD

Chiller Service Agreement
Term Contract, Alteration
Post-Bid
Brookings, SD

Belle Fourche Area Community Center Phase II HVAC Replacement
Results
Belle Fourche, SD 57717

Design Build - Replace Chillers
Term Contract
Post-Bid
Sioux Falls, SD 57198

Barracks HVAC Upgrades
Results
Springfield, SD 57062

Gear Building CGMP HVAC Modifications
Alteration
Post-Bid
Vermillion, SD

Reported 07/14/2022 12:00 AM
Project Title

Generator Air Coolers, Gavins Point Dam

Physical Address View project details and contacts
City, State (County) Yankton, SD 57078   (Yankton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install 8 new generator air coolers per unit as well as one spare generator air cooler to be retained by Gavins Point for a total of 25 newly designed generator air coolers. This contract also calls for the install of 4 new thrust bearing oil coolers per unit as well as one spare thrust bearing oil cooler to be retained by Gavins Point for a total of 13 newly designed thrust bearing oil coolers. In addition to the coolers, this contract calls for the installation of new raw water strainers for each Main Unit (3 total). Finally, this contract will include the replacement of all associated supply piping.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents