Similar Projects
Waterfront East
Demolition, LEED Certification, New Construction, Infrastructure - 300,000 SF
Conception
$100,900,000 CJ est. value
Vancouver, WA 98661

Brush Prairie Baptist Church Addition
Addition, Infrastructure
Conception
$1,000,000 CJ est. value
Vancouver, WA 98662

Fruit Valley Modernization
Build-out, Renovation, Infrastructure
Design
$4,754,309 CJ est. value
Vancouver, WA 98660

Westside Wastewater Treatment Facility (WWTF) Backflow Prevention Improvements
Infrastructure
Design
$95,500 CJ est. value
Vancouver, WA 98660

NorthEast 58th and Andresen Sanitary Sewer Improvements
Infrastructure
Bidding
$597,000 CJ est. value
Vancouver, WA 98661

Fruit Valley Road Stormwater Overflow
Infrastructure
Bidding
$741,340 CJ est. value
Vancouver, WA 98660

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Post-Bid
$210,000,000 CJ est. value
Kirkland, WA 98033

Glenwood Pump Station Transfer Switch
Renovation
Results
$50,000 to $55,000 est. value
Vancouver, WA 98662

NE Munch Road
Infrastructure
Results
$689,000 to $805,000 est. value
Vancouver, WA

Villagio Mixed-Use Development
New Construction, Infrastructure - 27,940 SF
Pending Verification
$15,000,000 CJ est. value
Vancouver, WA 98662

Curtain Creek Warehouses
New Construction, Infrastructure - 343,720 SF
Pending Verification
$15,000,000 CJ est. value
Vancouver, WA 98662

NE 90th Circle Apartments
New Construction, Infrastructure
Conception
$27,500,000 CJ est. value
Vancouver, WA 98665

SR 500 / I-5 to NE 112th Ave Vicinity - Replace Fiber
Infrastructure
Design
$553,000 CJ est. value
Vancouver, WA 98682

2022 Preservation ADA Improvements - Group 2B
Infrastructure
Bidding
$375,000 CJ est. value
Vancouver, WA 98660

Last Updated 10/14/2022 07:05 PM
Project Title

2022 Fall Pump & Well Project

Physical Address View project details and contacts
City, State (County) Vancouver, WA 98660   (Clark County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes all labor, tools, appliances, materials, and equipment for pump replacement and/or repair work and televising the following: Ellsworth, Booster 1 - 3 Stage Vertical Turbine Ellsworth, Booster 2 - 3 Stage Vertical Turbine Water Station 14, Booster 1 - 3 Stage Vertical Turbine Water Station 14, Booster 2 - 3 Stage Vertical Turbine Water Station 7, Well 2B - Submersible Deep Well Pump The Contract work shall be fully complete within 120 days from the Notice to Proceed (NTP) date. Questions Due Date: Oct 6th 2022, 5:00 PM PDT ENGINEERS ESTIMATE: $150,000 Questions and requests for clarification regarding this project may be addressed to James Nieman, Procurement Specialist at james.nieman@cityofvancouver.us by 3:00 p.m., October 6, 2022. Questions received after the deadline may not be considered. If required, an addendum addressing questions or changes to the specification will be issued no later than October 13, 2022.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents