Similar Projects
Douglas Pike Water Main Installation - 23-Wtr-05 - Town Of Smithfield
Alteration
Conception
$2,000,000 est. value
Smithfield, RI 02917

Post-Type Fire Hydrants
Term Contract
Post-Bid
Warwick, RI

Brass Fittings and Valves
Term Contract
Post-Bid
Warwick, RI

2021 Water Main Replacement Dewey Avenue and Option 1 Hobson Avenue
Results
Newport, RI 02878

Water Treatment Services
Infrastructure
Results
Kingston, RI

Water Distribution System Improvements Main Replacement Project 12
Post-Bid
Pawtucket, RI

Water Utilities Hydrants
Infrastructure
Results
East Providence, RI

Field`s Point Actuator Replacement
Post-Bid
Providence, RI

Annual Backflow Preventer Testing and Cross Connection Inspection Services
Term Contract
Results
Westerly, RI

University of Rhode Island Utility Service Contract - 3 Years
Term Contract
Post-Bid
Providence, RI

Water Main Replacement Project
Infrastructure
Results
Westerly, RI

South End Public Water System Improvements
Infrastructure
Post-Bid
Bristol, RI 02809

Meadowbrook Drive Water Main Replacement
Alteration
Results
Cumberland, RI 02864

Burns Manor Water Line Replacement
Infrastructure
Post-Bid
Pawtucket, RI 02860

Lead Services Line Replacement Program 2021-2022
Term Contract, Infrastructure
Results
Providence, RI

Last Updated 06/30/2022 09:15 AM
Project Title

Water Main Replacement Route 7 And Route 295 Bridge - 23-WTR-02 - Town of Smithfield

Physical Address View project details and contacts
City, State (County) Smithfield, RI   (Providence County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2025
Bids Due View project details and contacts
Estimated Value $1,364,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Rte. 7 water main which is our main supply line, that is connected under the bridges that cross both Rte. 295 north bound and south bound, has been identified as the most vulnerable main in our distribution system. This main is planned to be replaced when the State replaces the bridges, which is scheduled in 2023 currently. This costs will be associated with that main replacement. This would upgrade this line from 12 to 16 inches, which is a main feed for the Town's water supply. This project is in included in the Town of Smithfield FY 2023-2027 Capital Improvement Plan (CIP). As of June 29, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents