Similar Projects
Ingles #122 / Asheville
New Construction, Infrastructure - 149,754 SF
Conception
$40,000,000 est. value
Asheville, NC 28806

Reed Creek Mixed Use Development
New Construction, Infrastructure - 6,264 SF
Design
$20,000,000 CJ est. value
Asheville, NC 28801

155 Biltmore Hotel
New Construction, Infrastructure
Design
$14,000,000 CJ est. value
Asheville, NC 28801

Army Reserve Center in Asheville, North Carolina
New Construction, Infrastructure - 31,637 SF
Bidding
$25,000,000 CJ est. value
Asheville, NC 28801

Aurora Drive Sanitary Sewer Rehabilitation
Infrastructure
Bidding
$985,000 CJ est. value
Asheville, NC 28805

Southside Stormwater Improvement
Infrastructure
Sub-Bidding
$230,000 CJ est. value
Asheville, NC 28801

Home Depot #3637 - Tool Rental Center / Asheville
Addition, Infrastructure - 5,152 SF
Sub-Bidding
$300,000 CJ est. value
Asheville, NC 28806

Carolina Lane and Langren Alley Resurfacing
Post-Bid
Asheville, NC

Parking Lot Landscaping
Post-Bid
Asheville, NC 28806

FY 21 Asphalt Resurfacing
Results
Asheville, NC

Overlook Drive Sidewalk Construction Project
Results
$260,255 est. value
Asheville, NC 28803

Oakcrest Subdivision
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Asheville, NC 28806

Sardis Road Apartments
New Construction, Infrastructure
Pending Verification
$112,000,000 CJ est. value
Asheville, NC 28806

Star Building
New Construction, Infrastructure - 5,000 SF
Design
$10,000,000 CJ est. value
Asheville, NC 28801

RFQ Design - Parking Feasibility-Traffic Flow Study
New Construction, Infrastructure
Bidding
$20,000,000 CJ est. value
Asheville, NC 28805

Last Updated 08/16/2022 10:35 AM
Project Title

Parking Lot Improvements, Countywide Projects

Physical Address View project details and contacts
City, State (County) Asheville, NC 28801   (Buncombe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 05, 2022, project bid date was moved to August 11 at10:00AM EST. Questions pertaining to the project can be submitted to GeneralServices@buncombecounty.org. Buncombe County reserves the right to reject any or all bids The Party ofthe First Part shall furnish and deliver all materials, and perform all of the work in the manner and form as provided by the approved design drawings and specifications from the preconstruction phase, and those items not on the approved design to ensure the project is functional and complete. These plans, specifications and documents to be titled "Parking Lot Improvements, Countywide Projects" are attached hereto and made a part hereof as if fully contained herein General Scope Items: a. It is unlawful to allow any person to bring to the project site or any County owned property, any type of firearms, alcoholic beverages, or drugs other than prescribed by a physician. The use of tobacco products on county owned property is prohibited. b. The contractor shall have a competent employee, directly employed by the 1 st tier contractor, on the project site any time the contractor or their subcontractor is working. c. The contractor shall be responsible for any permits required to perform their work. This includes but is not limited to: building, mechanical, electrical, plumbing, street closure, sidewalk closure and parking space closure permits. d. The contractor shall be responsible for scheduling and coordinating for inspections required for completing their work. e. The contractor shall be responsible for protecting existing property and equipment from damage. Any damage caused shall be repaired at the contractor's expense. f. The contractor shall be responsible for providing and maintaining all traffic control that pertains to their work. g. The contractor shall be responsible for furnishing and maintaining all necessary equipment for their work. This includes but is not limited to: cranes, tools, ladders, scaffolds, hoists, forklifts and man lifts. All necessary unloading and distribution of materials for the work is also the responsibility of the contractor. h. The contractor shall be responsible for their own trash and debris removal. The project site should be kept clean and orderly. Trash is to be removed daily and legally disposed of. 6. Specific scope items: a. Each site has a specific scope. Please pay attention to the plans and specification for each site accordingly. b. All work shall be performed in accordance with the provided drawings and specifications.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents