Similar Projects
HVAC Upgrades to West Virginia State Office Building Nos. 5, 6, & 7
Renovation
Design
$50,000 CJ est. value
Charleston, WV 25301

Partial HVAC Replacement at James Monroe High School and Monroe County Technical Center
Renovation
Sub-Bidding
$400,000 CJ est. value
Lindside, WV 24951

Westside High School HVAC Testing Adjusting and Balancing Project
Renovation - 119,579 SF
Sub-Bidding
$180,000 CJ est. value
Clear Fork, WV 24822

Inspection and Cleaning of Kitchen Hoods
Term Contract
Post-Bid
Charleston, WV

HVAC Systems Preventative Maintenance and Repair Contract
Term Contract
Post-Bid
Fayetteville, WV

HVAC and Reroofing Projects
Alteration
Results
Chapmanville, Logan, WV 25508

Pocahontas County Schools ESSER HVAC Improvements
Alteration
Results
Buckeye, WV

Provide & Install a New Gas Boiler in the Kanawha County Courthouse
Addition, Demolition, New Construction, Build-out, Renovation
Construction
$301,000 CJ est. value
Charleston, WV 25302

Edison Middle School HVAC Renovations
Renovation
Construction
$3,727,400 CJ est. value
Parkersburg, WV 26101

Renovations to Board of Education Office Boiler Room
Renovation
Sub-Bidding
Princeton, WV 24740

Municipal Building HVAC Project
Alteration
Post-Bid
$50,000 est. value
Chester, WV 26034

Comprehensive HVAC & Utility Management Services Service Agreement
Term Contract
Results
Martinsburg, WV

Replacement of Lodge HVAC at Camp Virgil Tate
Renovation
Sub-Bidding
Charleston, WV 25312

Mid Ohio Valley Technical Institute - Dust Collection System Replacement
Infrastructure
Post-Bid
$400,000 est. value
Saint Marys, WV 26170

Sharon Dawes Elementary - HVAC Replacement and Renovation
Renovation
Results
$3,127,000 CJ est. value
Eskdale, WV 25075

Last Updated 12/18/2023 02:33 PM
Project Title

McDowell County Roof Top Units and HVAC Controls

Physical Address View project details and contacts
City, State (County) Bradshaw, WV 24879   (McDowell County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $2,249,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 15, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The Project includes the following Work: Upgrades to the automatic temperature controls at Southside Elementary School, replacement of rooftop units at Southside Elementary School, replacement of Gymnasium rooftop unit at Fall River Elementary School, and replacement of Gymnasium rooftop air handlers at Mount View High School. The Work will be substantially completed within 270 calendar days after the date when the Contract Times commence to run, and completed and ready for final payment within 300 days after the date when the Contract Times commence to run. Liquidated damages shall be $750.00 per day Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Envelope No. 2 labeled Bid Proposal shall also be placed inside of Envelope #1. A bidder may not withdraw his bid for a period of ninety (90) days after the date set for the opening of bids. Bids shall be accompanied by a certified check or bid bond payable to McDowell County Board of Education in an amount equal to five percent (5%) of the base bid. Contractor is required to provide the Drug Free Workplace Certification in accordance with WV Code 21- 1D-5. All Bidders are required to have a West Virginia Contractors License per Section 30-42-12 of the West Virginia Code. Bids received after the scheduled closing time for the reception of bids will be returned unopened to the bidders. The McDowell County Board of Education reserves the right to reject any and all bids. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Last day for questions is Friday, July 15,2022 at 2:00 p.m.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents