Similar Projects
West Plant Well
Infrastructure
Bidding
Pensacola, FL

Nassau Water Reclamation Facility (WRF) Exploratory Injection Well
Infrastructure
Bidding
$950,000 est. value
Jacksonville, FL

Wet Well Cleaning
Post-Bid
North Port, FL

Well Testing, Drilling And Maintenance
Demolition, Term Contract
Post-Bid
FL

New Condenser Water Return Well No.2
Term Contract
Results
Tallahassee, FL 32307

Mechanical Integrity Testing of the SRPF, WTP 11, and SROC Deep Injection Well Projects
Results
$145,000 est. value
Belle Glade, Boca Raton, Delray Beach, FL

Southeast Lee County Test and Observation Wells
Infrastructure
Bidding
$300,000 est. value
Fort Myers, FL

Progressive Cavity Pump - Sludge Feed Pump
Post-Bid
Port Saint Lucie, FL

Well Cleaning and Maintenance Services
Results
Less than $481,800 est. value
Key Biscayne, FL 33149

Phase 3 Infiltration Correction Services - Installation of Pumps and Boxes
Infrastructure
Bidding
$40,000 est. value
Clewiston, FL

Pump for Reclaimed Water Distribution, Vertical Turbine, OEM
Post-Bid
FL

WTP Improvements & New Potable Well #2
Results
Less than $300,000 est. value
Astatula, FL 34705

North Water Treatment Plant Feedwater Pump and VFD Replacement
Infrastructure
Bidding
$320,000 est. value
Jensen Beach, FL 34957

Well Boring and Drilling
Post-Bid
Tampa, FL

Pump and Motor Maintenance Services
Term Contract
Results
Sarasota, FL 34230

Reported 05/28/2022 12:00 AM
Project Title

Hollow Shaft High Service Pump Motor - 250HP

Physical Address View project details and contacts
City, State (County) Tampa, FL   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $25,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Hillsborough County requires a qualified Contractor for the one-time purchase of a US Motors Shaft High Service Pump Motor (or equivalent) for the Water Resources Department.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents