Similar Projects
SR 410/0.75 miles W of East Winter Gate - Culvert Lining
Infrastructure
Conception
$450,000 CJ est. value
Enumclaw, WA 98022

Main Street Place Development
New Construction, Infrastructure - 1,000,000 SF
Design
$380,000,000 CJ est. value
Bellevue, WA 98005

Bioretention and Water Quality Treatment at 126th Ave NE
Infrastructure
Design
$214,581 CJ est. value
Kirkland, WA 98033

I-405, NE 85th Street Interchange and Inline BRT Station Project
Infrastructure
Bidding
$210,000,000 CJ est. value
Kirkland, WA 98033

The Seattle Public Library Green Lake Branch URM Seismic Upgrade and Renovation
LEED Certification, Renovation, Infrastructure
Bidding
$4,627,000 CJ est. value
Seattle, WA 98115

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Heavy Civil General Contractor/Construction Manager Services for Atlantic Base Yard Refurbishment Project
Infrastructure
Post-Bid
$22,000,000 est. value
Seattle, WA 98134

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

Renton High School Student Store Improvements
Renovation, Infrastructure
Construction
$557,000 CJ est. value
Renton, WA 98057

Olive + Bellevue Mixed Use Development
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Seattle, WA 98122

Western Avenue Apartment Building
Demolition, New Construction, Infrastructure
Pending Verification
$56,600,000 CJ est. value
Seattle, WA 98121

NE 45th Street Apartments
Demolition, New Construction, Build-out, Infrastructure
Design
$86,800,000 CJ est. value
Seattle, WA 98105

RFQ D/B - Northshore School District Modernization and/or Additions Projects
Addition, Demolition, Renovation, Infrastructure
Bidding
$30,750,000 CJ est. value
Bothell, WA 98011

New Transition Services Educational Facility
New Construction, Infrastructure
Post-Bid
$2,500,000 CJ est. value
Bellevue, WA 98004

Last Updated 09/24/2022 03:33 AM
Project Title

183rd Avenue Northeast Waterline Emergency Extension

Physical Address View project details and contacts
City, State (County) Redmond, WA 98052   (King County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $195,120 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work to be performed shall include: Construction of approximately 150 linear feet of watermain improvements, including but not limited to installation and testing of 8-inch diameter ductile iron watermain, connection to existing City of Redmond and City of Bellevue watermains, and other work, necessary to complete the project. Engineers Estimate for this work is $150,000 to $190,000. All physical work shall be completed in the time specified in Section 1- 08.5. All bid proposals shall be accompanied by a bid deposit in the form of a certified or cashiers check or surety bid bond made payable to the City of Redmond, for a sum not less than five percent (5%) of the total amount of such bid including sales tax. and all listed additives and alternates. The City of Redmond , in accordance with Title VI of the Civil Rights Act of 1964, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 Code of Federal Regulations Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or gender in consideration for an award. or an award. Small, minority and womenowned business are encouraged to participate m the bidding as prime contractors, subcontractors, or suppliers. The City reserves the right to reject any and all bids and to waive any informalities or irregularities in the bid or in the bidding process, and make the award as deemed to be in the best interest of the City *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. 183rd was awarded to Fury Site Works for $195,120.38. Construction started 9/19/22.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents