Similar Projects
Last Updated | 05/08/2023 02:34 AM |
Project Title | RFP D/B - South Rim Fire Station Building |
Physical Address | View project details and contacts |
City, State (County) | Stockton, UT 84071 (Tooele County) |
Category(s) | Government/Public, Heavy and Highway |
Sub-Category(s) | Fire/Police Station, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected September 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $1,350,000 [brand] Estimate |
Plans Available from | Consultant |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Tooele County is soliciting for a design/build from licensed and insured vendor for a South Rim Fire Station building located at: 2555 W Silver Ave, Stockton, UT 84071. budget of $1.35 Million Proposal shall be submitted in a sealed envelope. The outside lower right-hand corner of the envelope shall be marked: Sealed Proposal of (Firm Name) South Rim Fire Station Tooele County Administration Building Questions must be submitted via email to Aspen Wimmer at aspen.wimmer@tooeleco.org or through the Utah State Purchasing U3P Website, and are due no later than Friday, May 12, 2023 by 5PM. The design/build must produce an operational fire station from an insulated steel building, or concrete block construction, built to Group S (Storage) standards. Building must be operationalm by December 31, 2023 and remain withing the budget of $1.35 Million while meeting the following specifications at a minimum: Overall Layout (please itemize the costs associated with each of these features): o 100 Feet Long by 50 Feet Wide (100'X50') minimum o 45,000 square foot asphalt drive way / parking lot (include an option for an additional 45,000 square feet of paving in back lot) o Concrete apron graded for drainage o Connect to local water and power (L&B Development & Rocky Mountain Power) o Building shall be fully fire sprinklered o Propane Tank install & setup o Septic Tank install & setup o Security cameras to monitor the exterior of the station, including the apron, all entrance doors, and the employee parking area o Security fence around the perimeter of the property, approximately 2,000 feet of fencing with 2 electric automatic gates and battery backup o Location for flagpole o Location for 60' tall communications tower (6'X6' area within 25' of mechanical room) o Add 1 fire hydrant, centered between the 2 existing hydrants on Silver Ave o 2.5" Metered water connection in back lot Garage: o 3 Bays (2 pull through) o 5 automatic overhead insulated garage doors, 14' minimum clearance o 2 interior hose bibs (one for hot water) o Gear decontamination area o Adequate space and hookups for commercial gear washer/extractor and dryer for cleaning PPE o Gear/locker room set as transition zone from Garage to Office o Storage racks o Bay circulation fans o LPG fired garage heaters o Polished non-slip concrete flooring with floor drains o Vehicle exhaust systems for the removal of exhaust produced by running vehicles indoors o Ceiling mounted cord reels for both power and compressed air o Incandescent or LED lights (no fluorescent or UV producing lights) o Space for tool boxes and workbenches o Exterior man door Office: o HVAC o Restroom / Kitchen / Janitors Closet / Utilities Room / Office space (room for 3 cubicles) o Interior Lighting o Exterior man door o Hard surface non-slip flooring (no carpet) o Minimum of 3 windows Question Deadline 04/28/2023 at 5:00 PM MT Questions must be submitted via email to Aspen Wimmer at aspen.wimmer@tooeleco.org or through the Utah State Purchasing Electronically. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |