Similar Projects
Pre-Event Generator Installation
Bidding

Shopping Center Electrical Upgrade Project
Bidding
FL

High Voltage Transformer Repair
Post-Bid
Patrick AFB, FL

Testing and Repair of Hydroelectric Generator Governor Systems at Hydroelectric Facilities for the U.S. Army Corps of Engineers
Post-Bid

Fans Lighting Hanger 750
Results
Patrick AFB, FL 32925

Lift Station #2 Panel Rehabilitation
Results
Cocoa, FL 32922

Repair Lightning Protection System
Post-Bid
Cape Canaveral, FL 32925

Studio Theatre Dimming System Upgrade - KCPA
Results
Melbourne, FL 32935

920 MXS Electrical Installation Services for Hgr 750
Post-Bid
Patrick AFB, FL 32925

Uninterruptible Power Supply (UPS) Systems Replacement
Results
$130,000 est. value
Melbourne, FL 32934

Strobe/Led Lights: Flat and Pipe Mount
Term Contract
Post-Bid

Lift Station RTU Panels
Results
Cocoa, FL

Rockledge ES Facility Renewal
Post-Bid
Rockledge, FL 32956

Generator Inspection and Maintenance for Water Resources
Term Contract
Results
$5,493 est. value
Titusville, FL 32781

Sykes Creek WWTF Generator Replacement
Results
$1,300,000 est. value
Merritt Island, FL 32963

Last Updated 12/26/2019 08:44 AM
Project Title

UPS and DC Power Systems - 800 Mhz Sites Service Agreement

Physical Address View project details and contacts
City, State (County) Viera, FL 32940   (Brevard County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all parts and labor necessary to inspection and maintain in operational condition the UPS and DC Power Systems-800 Mhz Sites. The terms of this agreement shall be effective January 1, 2020 through December 31, 2023 (or for three years from the date of award). The agreement may be extended by mutual agreement, for an additional two (1) year renewals with the option to negotiate pricing, terms and conditions. Brevard County will notify the Contractor in writing ninety (90) days prior to the expiration of the agreement as to its intent to renew the agreement.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents