Similar Projects
Gloucester Courthouse Pedestrian Facility - TAP
Infrastructure
Bidding
Gloucester, VA 23061

Blue Ridge Farms Phase 4 - Water, Sanitary, Storm Sewer and Sidewalk Improvements
Infrastructure
Bidding
Lynchburg, VA

Construct New Terminal Building Site Work - Phase 1
Post-Bid
Winchester, VA 22602

Construct New Terminal Building Site Work - Phase 1
Post-Bid
Winchester, VA 22602

Market Avenue Parking Lot Improvement - Phase II
Results
Waynesboro, VA

Statewide ADA Project Group II
Results
VA

Gloucester County Accessible Walkway
Infrastructure
Bidding
Gloucester, VA

2018 Sidewalk Improvements Near Tobacco Trail
Post-Bid
Lawrenceville, VA

Streetscape Improvements
Results
Less than $1,529,448 est. value
VA

Sidewalk Repair - Edinburg Residency
Term Contract
Post-Bid

Construction Project, CSS# 22935 Repave MEP lot and Replace Fence - Fort Belvoir, VA (VA020)
Results
$500,000 to $1,000,000 est. value
Fort Belvoir, VA 22060

Construction of New Parking Lot at the Johnson Court (VA2-2) Development
Post-Bid
Bristol, VA

2021 Residential Resurfacing and Concrete Program
Results
Newport News, VA 23607

Construction of 18th Street Corridor Improvements
Infrastructure
Post-Bid
Virginia Beach, VA 23451

Annual Sidewalk, Curb and Gutter Replacement Services
Term Contract
Results
$25,000 to $100,000 est. value
Harrisonburg, VA

Last Updated 11/30/2021 02:49 PM
Project Title

Sidewalk Improvements - Package 2 (FY21)

Physical Address View project details and contacts
City, State (County) Richmond, VA 23223   (Richmond City County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of the Sidewalk Improvements Package 2 (FY21), to provide general contracting services that include, but are not limited to: mobilization, maintenance of traffic (vehicular and pedestrian), street closures, sidewalk construction, sidewalk and curb demolition and replacement, handicap ramp installation, pavement patching, tree root work, tree removal, stump removal, adjusting utility castings, adjusting/replacing drainage basins, and all other work necessary to repair existing sidewalk. These sidewalk improvements/repairs will improve pedestrian access and safety along 200 N. 25th Street, 300 North Harrison Street, 700 Mosby Street, 800 Maury Street, 900 Maury St, 100 Maury Street, 1500 Mechanicsville Turnpike, 2000 Broad Rock Boulevard, and 2400 East Marshall Street.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents