Similar Projects
West Air Cargo Apron Reconstruction
Infrastructure
Conception
$8,000,000 est. value
Phoenix, AZ

Construct/Realign-Taxiways D3,D4,D7,D8 - CP1038 - City of Mesa
Alteration
Conception
$4,115,345 est. value
Mesa, AZ 85215

Phoenix Goodyear Airport Construct New Apron and Taxiway Connector
Infrastructure
Design
$7,102,620 est. value
Goodyear, AZ 85338

Airport Pavement Management System (APMS) Construction at 32 Airports
Infrastructure
Post-Bid
$4,000,000 est. value
Phoenix, AZ

Taxiway C Rehabilitation
Results
$775,000 to $975,000 est. value
Chandler, AZ

Glendale Municipal Airport Taxiway Rehabilitation
Results
Glendale, AZ

Falcon Field Airport Taxiway C Run-Up Area - CP0691 - City of Mesa
Infrastructure
Conception
$1,720,720 est. value
Mesa, AZ 85215

Airport Pavement Management System (APMS) Construction for 10 Airports
Term Contract
Results
Mesa, Prescott, San Manuel, Sedona, Seligman, Springerville, Tucson, AZ 85643

Falcon Field Airport Design/Build Taxiway - Delta 9 - CP0996 - City Of Mesa
Renovation, Infrastructure
Conception
$521,429 est. value
Mesa, AZ 85215

Runway 4L-22R Headwalls Reconstruction
Results
$100,000 to $150,000 est. value
Chandler, AZ

Dema Fitness Track Rehabilitation Single
Results
Phoenix, AZ 85008

Taxiway W Rehabilitation
Infrastructure
Results
$800,000 est. value
Phoenix, AZ

Phoenix Sky Harbor International Airport New Crossfield Taxiway U Construction Manager at Risk Services
Infrastructure
Results
$220,000,000 est. value
Phoenix, AZ

PSHIA Utility Vault Upgrade and Infield Paving Construction Manager at Risk Services
Infrastructure
Results
$11,000,000 est. value
Phoenix, AZ

Glendale Municipal Airport Taxiway A Rehabilitation Phase II
Infrastructure
Results
Glendale, AZ 85307

Reported 07/08/2022 12:00 AM
Project Title

Airport Taxiway and Southern Apron Phase II Project

Physical Address View project details and contacts
City, State (County) Buckeye, AZ 85326   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $1,066,358 [brand] Estimate
Plans Available from Municipal Agency - 06/09/22
Owner View project details and contacts
Architect View project details and contacts
Description

Preview Note: This is a Previous Version 5 of this Project that was saved on 06/10/2022 07:37 AM by Matthew Douglas. Reverting to a previous version will add/remove any information that has changed since this revision. Airport Taxiway and Southern Apron Phase II project Details Status GC Bidding Sub Status Bidding Sector Public - City Max Value $1,066,358 Solicitation # 2022046, 3-04-0005-025-2022, 1018028.05 Bond(s) Bid(10.0%), Perf.(100.0%), Payment(100.0%), Cert Check Set Aside(s) MBE(20%), WBE(7%) Documents Availability Available From City of Buckeye Note Contractors wishing to submit a Bid may obtain the IFB packet by contacting the City of Buckeye, Pat Glasmann at pglasmann@buckeyeaz.gov or 623-349-6173. IFB Packets may also be electronically Portal. 63 Plans 13 Specifications 0 Addenda 2 Other Structures Structure 1 Site Work Transportation Terminals Structure 2 Paving Transportation Terminals Events Bid Date Jul 07, 2022 at 3:00 PM The City of Buckeye is seeking sealed bids from qualified contractors. Plans Available Jun 09, 2022 Contractors wishing to submit a Bid may obtain the IFB packet by contacting the City of Buckeye, Pat Glasmann at pglasmann@buckeyeaz.gov or 623-349-6173. IFB Packets may also be electronically Portal. Start Date Aug 08, 2022 Pre-Bid Meeting Jun 21, 2022 at 10:00 AM Pre-Bid Mtg. /Site Visit at the Buckeye Municipal Airport. End Date Nov 03, 2022 Question Deadline Jun 30, 2022 at 5:00 PM Description Site work and paving for a transportation facility in Buckeye, Arizona. Completed plans call for site work for a transportation facility; and for paving for a transportation facility. The City of Buckeye is seeking sealed bids from qualified contractors for the Airport Taxiway & Southern Apron Phase II project.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents