Similar Projects
Last Updated 01/07/2021 04:42 PM
Project Title

2020 Waterline and Street Improvements

Physical Address View project details and contacts
City, State (County) Eaton, CO 80615   (Weld County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value Less than $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The 2020 Waterline and Street Improvements will involve the construction of approximately 3,645 LF of 8" C900 PVC waterline, 81- 3/4" copper water services, 5-fire hydrants, 16, 173 SY of 2" asphalt mill and overlay, 4,455 SY of 3.5" HMA over 12" ABC, 58 concrete ADA ramps, 88 LF of vertical curb and gutter, 324 SY of concrete sidewalk and other miscellaneous work The work will located between Cheyenne Avenue and Elm Avenue and between 3rd Street and 5th Street in Eaton, CO.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents