Similar Projects
Chemical Treatment of Deep Wells
Bidding
East Saint Louis, IL

Chemical Treatment of Deep Wells
Bidding
East Saint Louis, IL

Submersible Explosion Proof Pumps
Post-Bid
Wheaton, IL 60187

Replacement OEM Moyno Pump Parts
Term Contract
Post-Bid
Waukegan, IL 60085

Phase 2 Installation of Monitoring Wells and Probes
Renovation
Results
Hanover Park, IL 60133

Northwest Waterworks Booster Pump VFD Installation and South Operations Center Pump VFD Replacement
Results
Naperville, IL 60540

Well No. 21 (Division A)
Bidding
Normal, IL

Pumping Equipment Repair and Maintenance Services
Term Contract
Post-Bid
Naperville, IL 60540

Improvements to City Well Number 31
Results
Naperville, IL 60540

Well No. 21 (Division B)
Bidding
Normal, IL

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

Barrington HS Sewage Ejector Pump Replacement
Results
Barrington, IL 60010

Well 6 Repairs
Bidding
Antioch, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

Well and Well House No. 3
Results
Less than $1,602,700 est. value
Pecatonica, IL 61063

Last Updated 11/04/2020 11:39 AM
Project Title

Country Club Lift Station Reconstruction

Physical Address View project details and contacts
City, State (County) Saint Charles, IL 60174   (Kane County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of new wet well with duplex submersible pump operation; Installation of new submersible solids handling pumps and controls; Associated electrical and instrumentation work; New valve / bypass vault; New meter vault; New electrical service; New traffic box control panel; Concrete control panel pads; Asphalt patching and curb restoration.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 08 - Openings.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Grading, Excavation and Fill, Dewatering, Shoring.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Rigid Paving Surface Treatment, Patching of Rigid Paving, Rigid Paving, Concrete Paving.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 40 - Process Integration, Digital Process Controllers, Distributed Process Control Systems, Process Control Hardware, Process Control Panels and Hardware.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents