Similar Projects
Yellow Barn Business Accelerator
New Construction, Demolition - 35,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Hardwick, VT

GW Plastics
New Construction
Design
Bethel, VT 05068

Simpson Temple Campground
New Construction - 2,100 SF
Design
$165,000 est. value
Lyndon, VT

VELCO Backup Data Center
New Construction
Sub-Bidding
$17,000,000 est. value
New Haven, VT 05472

Y--405-15-101 Replace Underground Utilities (Construction) (Va-19-00055590)
New Construction, Demolition
Post-Bid
$5,000,000 to $10,000,000 est. value
White River Jct, VT 05009

Burlington Greenway Rehabilitation Leddy Pause Place & Beach Access and Starr Farm Fitness Station
Post-Bid
Burlington, VT 05401

Request for Qualifications for Site Work Services
New Construction, Demolition
Results
$400,000 est. value
Lyndonville, VT 05851

Bluffside Trail Project
Results
$1,200,000 est. value
Newport, VT

The Cadillac Motel
New Construction, Renovation - 22,904 SF
Construction
$1,613,200 est. value
Saint Albans, VT 05478

Yestermorrow Design/Build School
New Construction, Demolition
Construction
Waitsfield, VT 05673

110 Gage Street
New Construction
Pending Verification
Bennington, VT 05201

Burger King
Renovation
Pending Verification
Brattleboro, VT 05301

Brookside Cottages
New Construction - 79,200 SF
Design
$785,000 est. value
Putney, VT

Sugarbush Mt. Ellen EVSE Installation
New Construction
Post-Bid
Warren, VT

Castleton STP 0161 (35)
Results
$250,000 to $500,000 est. value
Castleton, VT 05735

Last Updated 05/30/2019 11:20 AM
Project Title

Monitor Well Drilling at Lake Carmi

Physical Address View project details and contacts
City, State (County) Montpelier, VT 05620   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Drill and install up to fourteen shallow monitoring wells at seven sites to enable groundwater sampling. Scope of Work: The general scope of work shall be as listed below. 1. Mobilization and demobilization of recommended drilling rig, crew, and consumables. 2. Drilling up to 14 boreholes to an average anticipated depth of 15 ft bgs (may be 10 to 20 ft bgs). 3. Complete each borehole with standard environmental monitoring well installation (suggested 2" PVC slotted screen/prepack, solid 2" screen/riser, filter sand, bentonite seal, and curb box) 4. Conduct initial well development 5. Provision of all necessary equipment, personal protective equipment, and consumables. 6. Returning within 2 months after monitoring activities have concluded, and in no case later than September 1, 2020 to remove headwords and backfill boreholes. The deliverables upon which the bid shall be based include 14 monitoring wells, completed at 15 feet below ground surface, on 7 properties around Lake Carmi. The actual detailed scope may vary as directed by the onsite DEC hydrogeologist. Based on the proposals received, the contract will include a cap on the number of days drilling. There shall be no interruptions due to normal weather. Project Timeline : Contract duration will likely be from October 22, 2018 to September 1, 2020
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents