Similar Projects
Albuquerque International Sunport Taxiway E Reconstruction, Phase B
Post-Bid
Albuquerque, NM 87106

Design Build (DB) Construction Services to Reconstruct Main Operation Apron at Cannon AFB, NM
Post-Bid
$5,000,000 to $10,000,000 est. value
NM

Las Cruces International Airport Terminal Apron Reconstruction
Results
Less than $2,100,000 est. value
Las Cruces, NM 88001

Runway 20 Runway Safety Area (RSA) Grading
Results
$869,506 est. value
Santa Fe, NM

Airfield Rubber Removal, Airfield Paint Removal, and Airfield Re-Striping (R3) Sources Sought
Post-Bid
Hondo, NM

Taxiway A Pavement Maintenance
Results
$115,354 est. value
Portales, NM 88130

Bid Project Kirtland AFB, NM-Repair Pad 3 Taxiway H and Apron B
Post-Bid
$5,000,000 to $10,000,000 est. value
Albuquerque, NM

Lea County Zip Franklin Memorial Airport Precision
Results
Lovington, NM 88260

Jicarilla Apache Nation Airport Runway 17-35 Rehabilitation
Post-Bid
Dulce, NM 87528

Raton Municipal Airport Precision Approach Path Indicator
Results
Raton, NM 87740

Design-Bid-Build, Construction Services to Reconstruct Apron A at Kirtland AFB, NM
Post-Bid
$5,000,000 to $10,000,000 est. value
Kirtland, NM

Hatch Municipal Airport Pavement Rehabilitation
Results
$350,000 to $450,000 est. value
Hatch, NM 87937

Repair Taxiway Delta & Mike
Post-Bid
$10,000,000 est. value
Clovis, NM

Colfax County Airport at Angel Fire Runway 17-35 Pavement Sealing
Results
Raton, NM 87740

Silver City Airport Improvements-2020 Rehabilitate/Reconstruct Taxiways and Aprons
Results
$2,175,734 est. value
Silver City, NM 88061

Last Updated 09/30/2020 08:52 AM
Project Title

Taxiway Alpha Improvements

Physical Address View project details and contacts
City, State (County) Texico, NM 88135   (Curry County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes approximately 2,200' of Taxiway Alpha reconstruction south of Runway 12-30, the permanent removal of the south portion of Taxiway Alpha, the permanent removal of Taxiway Charlie, drainage improvements, and taxiway lighting and signage along Taxiway Alpha.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents