Reported 05/23/2020 12:00 AM
Project Title

Runway 9R/27L and Associated Paved Runway Shoulders

Physical Address View project details and contacts
City, State (County) Waterford, MI   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The connector taxiways north of Runway 9R-27L will also be rehabilitated, removed, or new taxiways constructed, including edge lighting systems. The project is needed due to the aged and deteriorating condition of existing pavements and lighting systems, as well as the need to improve aircraft traffic flow on the connector taxiways between Runway 9R-27L and Runway 9L-27R. Construction is expected to start in late April 2021 and be completed within 85 calendar days. A summary of the proposed improvements includes: •Runway 9R/27L pavement rehabilitation •Runway 9R/27L shoulder pavement rehabilitation •Runway and taxiway edge lighting replacement •Taxiway pavement rehabilitation expansion •Taxiway removals •Taxiway construction During construction, runway use and flight patterns will be modified. The proposed project will result in some aircraft being diverted from the primary runway (Runway 9R/27L) to the parallel runway (Runway 9L/27R).

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents