Similar Projects
727 Massachusetts Avenue Hotel Addition
Addition, Demolition, Renovation, Infrastructure - 51,250 SF
Post-Bid
$20,000,000 CJ est. value
Boston, MA 02203

Hot Mix Asphalt Recreation Path
Post-Bid
$132,400 est. value
Lincoln, MA

World-Wide Water Storage Tank Remediation
Term Contract
Results

Waban Hill Reservoir Improvements
Results
Less than $900,000 est. value
Newton, MA

New Compound Semiconductor Lab/Microsystem Integration Facility (CSL/MIF)
Demolition, New Construction, Infrastructure - 160,000 SF
Construction
$276,858,491 CJ est. value
Hanscom AFB, MA 01731

New Compound Semiconductor Lab/Microsystem Integration Facility (CSL/MIF)
Demolition, New Construction, Infrastructure - 160,000 SF
Construction
$276,858,491 CJ est. value
Hanscom AFB, MA 01731

Central Square Mixed-Use Development
New Construction, Build-out, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Chelmsford, MA 01824

Project Echo
New Construction, Infrastructure - 800,400 SF
Pending Verification
$86,000,000 CJ est. value
Holliston, MA 01746

Trolley Brook Trail from Memorial Drive to Megunko Road
Post-Bid
Ashland, MA

Resurfacing and Related Work on Sections of Interstates 93 and 495
Results
Less than $6,046,275 est. value
Chelmsford, Medford, Somerville, Stoneham, MA

St. Andrews Episcopal Church Solar Canopy
Alteration
Pending Verification
Framingham, MA 01702

FY21 Stormwater Improvements
Post-Bid
Ayer, MA

Scheduled and Emergency Resurfacing and Related Work at Various Locations
Results
$2,855,500 est. value

Isobel Lofts
Demolition, New Construction, Infrastructure - 33,943 SF
Pending Verification
$6,000,000 CJ est. value
Lowell, MA 01852

Pine Hill Access Road and Campus Improvements - General Bid
Post-Bid
$1,466,000 est. value
Sherborn, MA

Last Updated 09/19/2022 10:34 AM
Project Title

Sewer/Stormwater - The Port - City of Cambridge

Physical Address View project details and contacts
City, State (County) Cambridge, MA 02138   (Middlesex County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Storage/Water Tanks, Storm/Sewers
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $80,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This multi-phase program will reduce the frequency and extent of flooding and improve infrastructure in the Port neighborhood. The FY23 authorization and bond of $60,000,000 will support the construction of one underground sewer tank and one underground stormwater tanks with over one million gallons of storage, public art in the neighborhood, and reconstruction of the streets and sidewalks with an emphasis on designing streets for all users and supporting the City's commitment to Complete Streets, Vision Zero and the Urban Forestry Master Plan. A 15-member Working Group is advising city staff. While significant work remains to be completed, the program is already reducing flooding in the Port neighborhood. The Parking Lot 6 (PL6) stormwater tank at Bishop Allen Drive went into operation in May of 2021 and captured roughly 3,480,000 gallons of stormwater during the summer of 2021. Prior to the completion of this tank, the Port neighborhood would have experienced significant flooding as a result of these summer storms. This project is included in the city's FY 2024-2027 Capital Improvement Program. As of September 19, 2022, further details regarding design and construction timelines have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. *The contact(s) will not accept phone call inquiries at this time.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents