Similar Projects
Janitorial Services for All Gary Community School Corporation (GCSC ) Schools
Term Contract
Sub-Bidding
Gary, IN 46402

Water Meters and Advanced Metering Infrastructure
Term Contract
Sub-Bidding
Munster, IN 46321

Identification, Design, And Implementation Of Energy Efficiency Improvements On A Self-Funding Performance-Contracting Basis
Term Contract, Infrastructure
Post-Bid
Hammond, IN 46322

Pest Control
Alteration
Post-Bid
East Chicago, IN

Crown Point High School Weight Room Equipment
Term Contract
Sub-Bidding
Crown Point, IN 46307

Liquid Aluminum Sulfate Zinc Orthophosphate
Alteration
Post-Bid
Hammond, IN 46322

2023 Graper Ditch Maintenance, State Street
Term Contract
Sub-Bidding
Winfield, IN 46307

Grounds Snow Removal Multiple Eskenazi Health Locations
Term Contract
Post-Bid
Indianapolis, IN

Gary Chicago International Airport
Term Contract
Post-Bid
Gary, IN 46406

Full Service Water Tank Rehabilitation and Maintenance Program
Term Contract
Post-Bid
Munster, IN 46321

Whiting Lakefront Park - ACOE Native Plantings
Term Contract
Post-Bid
Whiting, IN 46394

2022 - West Creek Ditch Maintenance
Term Contract
Post-Bid
Cedar Creek Township, IN 46356

Air Compressor/Cascade Fill Station (fixed)
Term Contract
Post-Bid
$80,000 CJ est. value
Lowell, IN 46356

2022 - West Creek Ditch Maintenance - Phase II
Term Contract
Post-Bid
Cedar Creek Township, IN 46356

Annual Bids for the Year 2023
Term Contract
Post-Bid
Crown Point, IN 46307

Last Updated 12/28/2022 03:06 PM
Project Title

Flow Metering and Hypochlorite Dosing Equipment

Physical Address View project details and contacts
City, State (County) Munster, IN 46321   (Lake County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This work will include supplying hypochlorite dosing equipment and magnetic flow meters at the Town's two water pump stations. Riverbend Pump Station: Hypochlorite dosing system shall include dosing pump, motor and controller, multi-function valve and installation kit. Calumet Avenue Pump Station: Hypochlorite dosing system shall include dosing pump, motor and controller, multi-function valve, installation kit, and chlorine residual analyzer. Flow metering equipment shall include three magnetic flow meters and all accessories and appurtenances necessary for installation and operation. All PLC programming modifications, HMI graphical modifications, and MetroCloud SCADA modifications necessary to ensure complete integration with the Town's SCADA system shall be included in the quote. The successful quoter shall provide start-up assistance and training as necessary. Installation of all equipment to be completed by others. No quoter may withdraw his proposal within a period of sixty (60) days following the date set for receiving bids. The Town of Munster reserves the right to retain any and all quotes for a period of not more than sixty (60) days and said quotes shall remain in full force and effect during said time. The Town further reserves the right to waive informalities, and to award the contract to any Quotes, all to the advantage of the Town of Munster, or to reject all quotes.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents