Similar Projects
Oklahoma City Freedom Center Restoration
Renovation
Conception
$2,000,000 est. value
Oklahoma City, OK

USPS IQ JOC Oklahoma
New Construction
Post-Bid

USPS IQ JOC Oklahoma
New Construction
Post-Bid

Replace and Upgrade P7 & P8 Elevator
Renovation
Results
$500,000 to $1,000,000 est. value
Muskogee, OK 74401

Job Order Contracting Services
New Construction
Results
Oklahoma City, OK

South Carolina Construction IDIQ
New Construction, Renovation, Addition
Post-Bid
$250,000 to $3,000,000 est. value

NM-Refuges-GAOA Wichita MTS Design/Build , Shop Complex & Bunkhouse
New Construction
Results
$10,000,000 est. value
OK

Moore Public Works
New Construction
Post-Bid
Moore, OK 73160

100 North Walker Fourth Floor Renovations
Renovation
Results
$150,000 est. value
Oklahoma City, OK 73102

Commercial Inspection Facility
New Construction
Post-Bid
$1,000,000 to $5,000,000 est. value
Tulsa, OK 74115

200 North Walker Third Floor Access Improvements
Renovation
Results
$260,000 est. value
Oklahoma City, OK 73102

Cemetery Gazebo
New Construction
Post-Bid
Lindsay, OK

GAOA Alt/Repair Construction Services MATOC
Renovation
Post-Bid

New Recycle Center Building
New Construction
Post-Bid
Muskogee, OK 74401

Market Survey - MMAC General Construction
Renovation, Alteration
Post-Bid
$23,000,000 est. value
Oklahoma City, OK 73169

Last Updated 10/25/2021 09:42 AM
Project Title

EOC Building Expansion

Physical Address View project details and contacts
City, State (County) Sapulpa, OK 74066   (Creek County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $298,700
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Furnish and Install a 30' X 60' Single slope building to match the existing 30' X 60' Building. 2. Low Eave Height shall be 15' (Field verify Existing Building) 3. High Eave Height shall be 20' (Field verify Existing Building) 4. Footings and Slab with 3500 PSI concrete with 5" slab over #4 rebar 18" E/W. 5. Slope of the roof shall be a 2"/12" to match existing the EOC Building 6. Side wall shall have 2-12' X 12' Over head doors / with Openers. 7. Furnish install one 3'X7' Man door 9. Furnish and install 3 inch Vinyl Back insulation on new building as well as the existing building. 10. Demo and reinstall new sheet metal on walls and roof of the existing EOC building. (County to keep existing sheet metal). 11. Labor and Material to install 6 quad receptacles on columns. 12. Labor and Material to install 5 Led 4 foot four lamp shop lights. (Match Existing Field Verify Location) 13. Labor and Material to 1 exterior water Faucets. (Field Verify Location) 14. Labor and Material to install thirty feet of an interior Partition wall to match existing. 15. Labor and Material to install 10 Quad Plug outlets in the storage room (Location per EM Director). 16. Labor and Material to install one Exhaust Roof Top fan with a controlled wall Louver on the North Side with timer wired to the system. 17. Labor and Material to install 5 feet wide by 70 feet long 4 inch concrete apron on the south and west side of Building. 18. Labor and Material to install 8' polar white Linear Panel on new and existing Building. 19. Labor and Material to install New A/C unit in the existing Attic and Duct Work to Existing offices and Bathroom and New Storage Room. 20. Labor and Material to install Drop acoustic ceiling in Storage Room to match the existing offices, with three 2 x 4 Lay in Led lights. 21. Labor and Material to install wall light band at the top of the end walls. 22. Contractor to supply Erection Drawings for approval. 23. Contractor to Supply engineered structural Footing.

Details

Misc. Buildings, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents