Similar Projects
Precast Concrete Headwalls
Bidding

Storm Sewer Connections and Treelawn Drainage
Results
Avon Lake, OH

Battenhouse Ditch Restoration Phase One
Results
Less than $126,750 est. value
Elyria, OH

Fabric Concrete Bag Reventment
Results

Box Culverts
Results

Concrete Pipes
Results

2019 Concrete Street Program
Results
$791,000 est. value
Avon Lake, OH

Culvert Replacement - SR 162-00.45
Results
OH

Green Road, TR-2, Roadway Drainage Improvement
Results
$89,625 est. value
Amherst, OH

Slide Repair - IR275-2.62 (55.70)
Results

Grafton Road Drain
Results
Elyria, OH 44035

Kipton Nickle Plate Roadway Improvements
Results
$150,000 est. value
Wellington, OH

2019 Concrete Street Program Phase 2
Results
Avon Lake, OH 44012

Boston Road Culvert Replacement
Results
Columbia Station, OH 44028

Culvert Invert Paving
Term Contract
Results

Last Updated 10/22/2019 08:35 AM
Project Title

Lorain Breakwater

Physical Address View project details and contacts
City, State (County) Lorain, OH 44052   (Lorain County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Lorain Breakwater: Work at the Lorain Detached Breakwater includes but is not limited to supplying all plant, labor, equipment, and materials necessary to repair the structure and construct a standalone rectangular cell, approximately 51 feet long by 31 feet wide, within the existing breakwater's gap. The standalone cell will be constructed from four steel sheet pile walls anchored to each other with steel tie rods and wales. The drive line for the steel pile must be cleared of large concrete rubble debris. The new cell is to be filled with granular material. Additional armor stone protection will be installed below water adjacent to the new cell. Repairs to the existing cells will include installation of large cover plates over existing cracked piles located on the lake side of 6 of the breakwater's circular cells. Cover plates will be installed above and below water using structural blind fasteners and rubber spacers. Approximately 40 small solar power light fixtures are to be installed on the existing cells.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents