Similar Projects
Alyssum and Twinflower Storm Line Replacement - City of Forest Grove
Infrastructure
Conception
$300,000 CJ est. value
Forest Grove, OR 97116

Park Place Bridgeport Mixed Use / Tualatin
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
King City, OR 97224

Westbrooke Estates Mixed Use
New Construction, Infrastructure - 9,800 SF
Design
$55,000,000 CJ est. value
Hillsboro, OR 97123

Fanno Creek Trail: Woodard Park-Bonita Road/85th Avenue-Tualatin Bridge
Infrastructure
Design
$5,980,000 CJ est. value
Tigard, OR 97223

SW Barnes Road and SW Viewmont Drive Waterline Improvements
Infrastructure
Bidding
$600,000 CJ est. value
West Haven-Sylvan, OR 97225

2023 Pavement Management Program 2023 roadway Striping Project
Infrastructure
Bidding
$211,285 CJ est. value
Tigard, OR 97223

RFP Engineering - Consulting Services for Design and Implementation Support for the District's Advanced Metering Infrastructure Project
Infrastructure
Post-Bid
$111,000 CJ est. value
Tigard, OR 97223

Beaverton High School Replacement - MEP (Mechanical, Electrical, Plumbing)
Demolition, New Construction, Infrastructure
Post-Bid
$210,800,000 CJ est. value
Beaverton, OR 97005

SW Division Street Culvert Replacement Project (Rebid)
Infrastructure
Results
$1,349,930 CJ est. value
Aloha, OR 97007

ASR 3 and 2 Wellhouse Improvements
Renovation, Infrastructure
Results
$4,381,728 CJ est. value
Tigard, OR 97223

Century Boulevard/TV Highway Intersection #100294 - Washington County
Infrastructure
Construction
$3,691,800 CJ est. value
Hillsboro, OR 97123

Highway 99W Pedestrian Crossing Project - City of Sherwood
New Construction, Infrastructure
Pending Verification
$11,500,000 CJ est. value
Sherwood, OR 97140

Scholls Heights Apartments
New Construction, Infrastructure
Pending Verification
$81,500,000 CJ est. value
Beaverton, OR 97007

Encompass Health Inpatient Rehabilitation Hospital / Hillboro
New Construction, Infrastructure
Conception
$36,000,000 CJ est. value
Hillsboro, OR 97124

OR8: SW Hocken Avenue - SW Short Street
Infrastructure
Design
$7,901,395 CJ est. value
Beaverton, OR 97005

Last Updated 05/30/2023 10:42 AM
Project Title

Hall-Watson Loop Improvements - 5120 - City of Beaverton

Physical Address View project details and contacts
City, State (County) Aloha, OR 97007   (Washington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected May 2024
Bids Due View project details and contacts
Estimated Value $5,860,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Downtown Loop Urban Design and Transportation Plan seeks to establish a strong connection between Old Town and Beaverton Central along SW Hall Boulevard and SW Watson Avenue between SW Crescent Street to SW Fifth Street. The plan will identify roadway and sidewalk improvements to establish a district identity, prioritize safety for people walking, biking and taking transit, and support the growing residential and business community. The project is included in the city's 2021-2030 Capital Improvement Program (CIP). As of May 30, 2023, a design/consultant team has been identified. FY 2022-2023 The Planning Phase of the project will conclude with the adoption of the Transportation and Urban Design Plan for the Loop, which will include preliminary cost estimates and an implementation program. At this point, the implementation program will be followed. In addition, the project team will continue to pursue funding opportunities for the project. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents