Similar Projects
Repair/Recondition One 50,000 GPM Vertical Centrifugal Water Pump (P-203)
Post-Bid
Baytown, TX 77520

Water Well No. 2
Post-Bid
TX

Water Well No. 4 at Water Plant No. 1
Results
Less than $1,450,000 est. value
TX

UCT-CHW & Booster Replacement
Results
Less than $143,731 est. value
Houston, TX 77030

Water Well No. 1 Replacement at Water Plant No. 1
Post-Bid
Less than $3,500,000 est. value
Houston, TX

Ground Water Well Rehabilitation Various Sites
Results
$2,639,083 est. value
Houston, TX 77000

Water Well and Plant Facilities - Site No. 1 Expansion
Post-Bid
Houston, TX

Water Well No. 6 Rehabilitation
Results
$120,800 est. value
Houston, TX 77084

MSB Chilled Water Pump Replacement
Post-Bid
Houston, TX 77030

Water Well No. 3
Results
Houston, TX 77002

Pump, Submersible, 2", Discharge, Trash
Post-Bid
Houston, TX 77251

CNP Utility District Water Well No. 2 Rehabilitation
Results
Houston, TX 77000

MHF80 Single Stage Vacuum Pump
Post-Bid
Houston, TX 77251

Water Well Number 1 Rehabilitation
Results
$117,300 est. value
Spring, TX 77388

Lift Station Wet Well and Discharge Pipe Coating
Post-Bid
TX

Last Updated 01/29/2020 12:38 PM
Project Title

Well No. 2 Profiling

Physical Address View project details and contacts
City, State (County) Houston, TX 77064   (Harris County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $270,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rent and install in Well No. 2 a temporary vertical turbine well pump and motor. Perform an Access Survey on Well No. 2 to determine the feasibility of inserting the well profiling tools in to the well and past the temporary pumping equipment. Make modifications to Well No. 2 as needed to ensure that the well profiling tools can properly be inserted and removed. Flush Well No. 2 by pumping continuously for 36 hours using the temporary pumping equipment. Complete the Well No. 2 Profiling investigation. Analyze the data gathered during the Well No. 2 Profiling investigation and prepare a written report presenting the data, the analysis of the data, and the results of the Well No. 2 Profiling. Remove the temporary vertical turbine well pump and motor from Well No. 2. Cleanup/Restore the project site.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents