Similar Projects
CHRL Pump Station 1a, 2, & 3
New Construction
Conception
$750,000 est. value
WA

South Wellfield Improvement Project - City Of Snoqualmie
Renovation, Infrastructure
Conception
$1,745,011 CJ est. value
Snoqualmie, WA 98065

Replace Existing Wastewater Lift Station 3
Renovation
Design
$200,000 est. value
Lacey, WA 98503

Solid Waste Facilities Pumps Systems Upgrades and Improvements Rebid
Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Lacey, WA 98516

Well No. 8
New Construction, Infrastructure
Bidding
$2,750,000 CJ est. value
Yakima, WA 98908

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

North Mercer Island and Enatai Interceptor Upgrade - Pump Station Improvements
Alteration
Post-Bid
Mercer Island, WA 98040

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Pleasant Valley Pump Station
New Construction, Infrastructure
Pending Verification
$800,000 CJ est. value
Vancouver, WA 98686

Well No. 7 - Pump and Control Building
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Prosser, WA 99350

Biosolids Dewatering and Lift Station Improvement
Renovation
Post-Bid
Twisp, WA

Richmond Beach Pump Station Low Voltage Switchboard and MCC Replacement
Alteration
Results
$2,558,000 est. value
Seattle, WA 98177

WWTP Near Term Tertiary Treatment Improvements
Infrastructure
Bidding
$2,550,000 CJ est. value
Marysville, WA 98270

Stehekin Fire Fighting Facilities Development Project
New Construction, Infrastructure - 6,724 SF
Post-Bid
$10,000,000 CJ est. value
Stehekin, WA 98852

Last Updated 09/16/2022 06:35 AM
Project Title

1040 Zone Booster Pump Station (BPS) Improvement Project - City of Snoqualmie

Physical Address View project details and contacts
City, State (County) Snoqualmie, WA 98065   (King County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $269,185 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will add a fifth 625 gallons per minute (GPM) pump in the 1040 Booster Pump Station (BPS). This project will also complete minor piping improvements and add a new telemetry cabinet. This project is included in the city's 2023-2028 Capital Improvement Plan (CIP). As of September 16, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents