Similar Projects
BPA Driscoll Seismic Enhancements
Renovation, Term Contract
Bidding
$500,000 to $1,000,000 est. value
Westport, OR

Klamath Falls Bridge Crew Room Asbestos Abatement
Term Contract
Results
Klamath Falls, OR 97603

Green Mountain Lookout Mountain Tower
Term Contract
Bidding
$100,000 to $250,000 est. value
OR

Construction of the Main Renovation Phase for Structural Steel, Exterior Insulation
Term Contract
Post-Bid
Eugene, OR 97403

Knight Library Exterior Restoration Phase A
Alteration
Results
Eugene, OR 97403

Last Updated 02/10/2022 06:48 PM
Project Title

Lent Copper Replacement Phase 2

Physical Address View project details and contacts
City, State (County) Portland, OR 97266 (Clackamas, Multnomah Counties)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace the copper panels from the eve of the school building using Metal wall panels to match the existing. Remove and replace the copper flashing from the around the eves of the school building. Contractor dispose of copper off site often enough to avoid theft and damage

Details

Division 09 - Finishes.
Division 33 - Utilities, Communications Distribution, Copper Communications Distribution Cabling.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents